中大機構典藏-NCU Institutional Repository-提供博碩士論文、考古題、期刊論文、研究計畫等下載:
English  |  正體中文  |  简体中文  |  Items with full text/Total items : 82005/82005 (100%)
Visitors : 53312483      Online Users : 538
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version

    Community Statistics


    Item counts issued in 3 years: 35(6.41%)
    Items With Fulltext: 546(100.00%)

    Download counts of the item
    Download times greater than 0: 546(100.00%)
    Download times greater than 100: 537(98.35%)
    Total Bitstream Download Counts: 361665(0.80%)

    Last Update: 2025-08-20 17:39

    Top Upload

    Loading...

    Top Download

    Loading...

    RSS Feed RSS Feed
    Jump to a point in the index:
    Or type in a year:
    Ordering With Most Recent First Show Oldest First

    Showing items 111-120 of 546. (55 Page(s) Totally)
    << < 7 8 9 10 11 12 13 14 15 16 > >>
    View [10|25|50] records per page

    DateTitleAuthors
    2019-01-25 運用巨量資料與系統模擬建構預鑄產業人力彈性運用之決策評估模型;Integrating precast big data and system simulation to improve manpower allocation for construction precast production 鄭鈞耀; Cheng, Jiun-Yao
    2019-01-21 可行性研究報告質量管理研究 - 以越南湄公河三角洲為例;A research on quality management of feasibility study reports - A case study of Mekong Rive Delta, Vietnam 張河世剛; Cuong, Truong Ha The
    2019-01-21 公部門組織導入BIM推動策略與決策評估模式之研究;A Study on Developing BIM Implementation Strategies and Decision Evaluation Model for Public Sector Organizations 周宏宇; Chou, Hung-Yu
    2018-12-19 測繪國家自主減量貢獻與國際永續發展目標:減量行動與公共認知(1/3);Mapping Domestic Ndcs to Global Sustainable Development Goals: Climate Actions and Stakeholder Perceptions(I) 李河清; 于蕙清
    2018-12-19 結合BIM技術之時程延遲分析技術研發;Development of a Schedule Delay Analysis Approach Integrated with Bim Technique 楊智斌
    2018-12-19 整合巨量資料與計算型智慧技術探討預鑄構件施作難易程度分級、勞工成本管控以及人力派遣最佳化之研究(II);Integrating Precast Big Data and Computational Intelligence to Classify Construction Difficulty, Manage Direct Labor Costs, and Optimize Manpower Allocation(Ii) 陳介豪
    2018-12-19 整合建築資訊模型與知識本體論以輔助消防安全設備自動化審查之研究;Integrating Building Information Modeling and Ontological Modeling to Facilitate Automated Fire Safety Equipment Reviews 王翰翔
    2018-12-19 橋梁管理系統自動化資料偵錯機制之建立;Establishing Automated Error Data Detection Mechanisms for Bridge Management System 姚乃嘉
    2018-08-22 營建工程S進度曲線(S-curve)建立方式與審查原則之研究;Development Principles and Review Criteria of S-curve for Construction Projects 劉心慧; Liu, Hsin-Hui
    2018-08-21 天然災害後橋梁特別檢測及修復優選排序模式之研究;A Model for Prioritizing Bridges for Damage Inspection and Rehabilitation after Natural Disasters 張榮安; Jallow, Mustapha

    Showing items 111-120 of 546. (55 Page(s) Totally)
    << < 7 8 9 10 11 12 13 14 15 16 > >>
    View [10|25|50] records per page

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明