English  |  正體中文  |  简体中文  |  全文筆數/總筆數 : 80990/80990 (100%)
造訪人次 : 42775213      線上人數 : 1131
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
搜尋範圍 查詢小技巧:
  • 您可在西文檢索詞彙前後加上"雙引號",以獲取較精準的檢索結果
  • 若欲以作者姓名搜尋,建議至進階搜尋限定作者欄位,可獲得較完整資料
  • 進階搜尋
    研究計畫 [127/127]
    博碩士論文 [350/350]
    考古題 [42/42]

    類別統計

    近3年內發表的文件: 0(0.00%)
    含全文筆數: 23(100.00%)

    文件下載次數統計
    下載大於0次: 23(100.00%)
    下載大於100次: 23(100.00%)
    檔案下載總次數: 18449(5.60%)

    最後更新時間: 2024-12-22 01:11


    上傳排行

    資料載入中.....

    下載排行

    資料載入中.....

    RSS Feed RSS Feed
    跳至:
    或輸入年份:
    由新到舊排序 由最舊的開始

    顯示項目1-23 / 23. (共1頁)
    1 
    每頁顯示[10|25|50]項目

    日期題名作者
    2011 Application of neural networks for detecting erroneous tax reports from construction companies Chen,JH; Su,MC; Chen,CY; Hsu,FH; Wu,CC
    2011 Computerizing ICBF Method for Schedule Delay Analysis Yang,JB; Tsai,MK
    2011 Framework development for state-level appraisal indicators of sustainable construction Huang,RY; Hsu,WT
    2011 Mapping multi-spectral remote sensing images using rule extraction approach Su,MC; Huang,DY; Chen,JH; Lu,WZ; Tsai,LC; Lin,JZ
    2011 TRUST EVALUATION MODEL WITH REGARD TO THE ROLE OF ENGINEER IN PUBLIC CONSTRUCTION PROJECTS IN TAIWAN Tzeng,WL; Li,JCC
    2010 A rule extraction based approach in predicting derivative use for financial risk hedging by construction companies Chen,JH; Yang,LR; Su,MC; Lin,JZ
    2010 Application of a SOM-Based Optimization Algorithm in Minimizing Construction Time for Secant Pile Wall Chen,JH; Su,MC; Huang,DY
    2010 Developing an SVM based risk hedging prediction model for construction material suppliers Chen,JH; Lin,JZ
    2010 Exploring the Deterioration Factors of RC Bridge Decks: A Rough Set Approach Huang,RY; Mao,IS; Lee,HK
    2009 A GA optimization model for workgroup-based repetitive scheduling (WoRSM) Huang,RY; Sun,KS
    2009 Comparison of SOM-based optimization and particle swarm optimization for minimizing the construction time of a secant pile wall Chen,JH; Yang,LR; Su,MC
    2008 Application of SOMO Based Clustering in Building Renovation Chen,Jieh-Haur; Su,Mu-Chun; Zhao,Yu-Xiang; Hsieh,Yi-Jeng; Chen,Wei-Hsiang
    2008 Development of an assessment framework for green highway construction Huang,Rong-Yau; Yeh,Cheng-Hung
    2008 Factor analysis of interface problems among construction parties - A case study of MRT Huang,Rong-Yau; Huang,Chin-Tien; Link,Hung; Ku,Wen-Hsiang
    2008 Factoring account receivables towards mitigating cash flow fluctuation for construction projects Chen,Jieh-Haur; Chen,W. H.
    2008 KNN based knowledge-sharing model for severe change order disputes in construction Chen,Jieh-Haur
    2008 Quantifying impact factors of corporate financing: Engineering consulting firms Chen,Jieh-Haur; Hsu,S. C.
    2007 Assessment of automation and integration technology's impacts on project stakeholder success Yang,Li-Ren; O'Connor,James T.; Chen,Jieh-Haur
    2006 An optimization model for workgroup-based repetitive scheduling Huang,Rong-yau; Sun,Kuo-Shun
    2006 Non-unit-based planning and scheduling of repetitive construction projects Rong-yau Huang,Kuo-Shun Sun
    2005 A construction simulation system (COMsim) with object-oriented modeling elements Huang,RY; Hsieh,BC
    2005 System development for non-unit based repetitive project scheduling Huang,R; Sun,KS
    2004 Planning gang formwork operations for building construction using simulations Huang,RY; Chen,JJ; Sun,KS

    顯示項目1-23 / 23. (共1頁)
    1 
    每頁顯示[10|25|50]項目

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明