中大機構典藏-NCU Institutional Repository-提供博碩士論文、考古題、期刊論文、研究計畫等下載:
English  |  正體中文  |  简体中文  |  Items with full text/Total items : 80990/80990 (100%)
Visitors : 41268858      Online Users : 170
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version
    Research Project [127/127]
    journal & Dissertation [23/23]
    retired tests [42/42]

    Collection Statistics

    Item counts issued in 3 years: 50(14.29%)
    Items With Fulltext: 350(100.00%)

    Download counts of the item
    Download times greater than 0: 350(100.00%)
    Download times greater than 100: 300(85.71%)
    Total Bitstream Download Counts: 222316(68.51%)

    Last Update: 2024-11-17 13:25


    Top Upload

    Loading...

    Top Download

    Loading...

    RSS Feed RSS Feed
    Jump to a point in the index:
    Or type in a year:
    Ordering With Most Recent First Show Oldest First

    Showing items 251-275 of 350. (14 Page(s) Totally)
    << < 5 6 7 8 9 10 11 12 13 14 > >>
    View [10|25|50] records per page

    DateTitleAuthors
    2010-07-29 莫拉克颱風毀損橋梁災因分析與維護管理機制之研究; Vulnerability Factors of Bridges Damaged by Typhoon Morakot and Mechanisms of Bridge Management and Maintenance 呂家賢; Chia-hsien Lu
    2010-07-29 大眾捷運系統土地聯合開發評審項目之研究-以台北都會區為例; The Agency responsible for constructing the Mass Rapid Transit System 卓哲宇; Che-yu Cho
    2010-07-29 氣候變遷對橋梁規劃與設計階段影響之研究; A Study on the Impacts to Bridge Planning and Design due to Climate Changes 莊友涵; Yu-han Chuang
    2010-07-27 營建廢棄物資源化產值評估模式建立之研究; Developing an appraisal model of market value for construction and demolition waste recycling 王瀚祥; Han-Shiang Wang
    2010-07-27 道路工程綠色內涵探討之研究; A Study on Green Connotation of Road Engineering 徐偉國; Wei-kuo Hsu
    2010-07-27 橋梁受災潛勢之評估與災損橋梁之管理; Evaluation Processes of Bridge Hazards and Inventory of Bridges Damaged by Disasters 楊文賢; Wen-hsien Yang
    2010-07-27 廢棄混凝土不同再利用方式減碳效益評估之研究; Assess the recycling of waste concrete in different ways to reduce carbon emissions. 潘彥任; Yen-jen Pan
    2009-06-26 橋梁維修標準工項之初步研究; A Preliminary Study on Standardization of Bridge Maintenance Activities 張凱帆; Kai-fan Zhang
    2009-06-26 橋梁維修與整建效益評估比較之研究; Comparison of Economic Efficiency of Rehabilitation and Replacement in Bridge Maintenance 翁愷翔; Kai-hsiang Weng
    2009-06-12 工程爭議佐證文件之關聯性研究; Study of the Relationship among Construction Claim Documents 黃華威; Hua-Wei Huang
    2009-06-12 裝潢修繕廢棄物總量概估與管理機制之研究; Estimation of Quantity and Management Framework for Household Renovation Wastes 施建成; Jian-Cheng Shin
    2009-06-12 後續擴充制度於工程採購適用性之研究; Study of the Use of Procurement Extensions in Public Works Procurement 王義昌; Yi-chang Wang
    2009-06-12 住宅服務績效指標之研究; Developing Performance Indicators for Residential Service 郭勁緯; Chin-wei Kuo
    2009-06-12 政府採購法後續擴充制度之執行模式與執行成效研究; Study of Procurement Extension in Government Procurement Law. 邱俊銘; Chun-ming Chiu
    2009-06-12 英國工程估價(Quantity; Surveying) 制度與導入之研究 A study of Quantity Surveying in Taiwan 楊志偉; Chih-Wei Yang
    2009-06-12 民間參與老人住宅建設之法令分析-以裁?學校改建為例; Studies of private participation in aged housing law for closed grade school. 蔡宛螢; Wan-Ying Tsai
    2009-06-12 綠色拆屋評估指標系統之研究; Development of An Appraisal System for Green Demolition 周宏宇; Hung-yu Chou
    2009-06-12 建築工程專案投資風險推估之研究; Estimating Investment Risk for Residential Construction Projects 林秉緯; Bing-wei Lin
    2009-06-12 營建廢棄物回收再利用二氧化碳減量效益評估模式建立之研究; Building a model for evaluate the benefit of CO2 emission reduction in recycling of construction and demolition waste. 施安餘; An-Yu Shih
    2009-06-12 臺灣地區橋梁目視檢測行程最佳化之研究; A Heuristic Approach for Optimizing Bridge Inspection Routes 柴志傑; Jhih-jie Chai
    2009-06-12 營建工程專案管理廠商執行困難之案例分析研究; Case study on the Difficulty Related to Professional Construction Management Practice 林姵廷; Pei-ting Lin
    2009-06-12 我國建築廢棄物產出因子與數量推估研究-以全國事業管制系統為對象; nvestigation of Factors for the Generation of Construction & Demolition Wastes in a Building Project in Taiwan 林建宏; Chien-hung Lin
    2008-07-07 制訂公共工程DBO統包契約要項之芻議-以FIDIC; Condition of Contract for Design ,Build and Operate Projects 為依據 A research proposal for framing the contract clauses about the public construction procured on a DBO basis -Perspective based on FIDIC Condition of contract for Des 許智傑; Chih-Chieh Hsu
    2008-07-07 因工期展延所生施工管理費之計算模型; Activity Based Costing of Management Fees Due to Extension of Time in Construction Projects 李明璋; Ming-chang Lee
    2008-06-23 拱橋與π型橋目視檢測評估方法之研究; Visual Inspection and Evaluation Standards for Arch and K-frame Bridges 廖家禎; Chia-Chen Liao

    Showing items 251-275 of 350. (14 Page(s) Totally)
    << < 5 6 7 8 9 10 11 12 13 14 > >>
    View [10|25|50] records per page

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明