English  |  正體中文  |  简体中文  |  Items with full text/Total items : 80990/80990 (100%)
Visitors : 42142559      Online Users : 1119
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version

    Community Statistics


    Item counts issued in 3 years: 50(9.23%)
    Items With Fulltext: 542(100.00%)

    Download counts of the item
    Download times greater than 0: 542(100.00%)
    Download times greater than 100: 495(91.33%)
    Total Bitstream Download Counts: 326933(0.80%)

    Last Update: 2024-12-04 11:53

    Top Upload

    Loading...

    Top Download

    Loading...

    RSS Feed RSS Feed
    Jump to a point in the index:
    Or type in a year:
    Ordering With Most Recent First Show Oldest First

    Showing items 111-120 of 542. (55 Page(s) Totally)
    << < 7 8 9 10 11 12 13 14 15 16 > >>
    View [10|25|50] records per page

    DateTitleAuthors
    2018-12-19 結合BIM技術之時程延遲分析技術研發;Development of a Schedule Delay Analysis Approach Integrated with Bim Technique 楊智斌
    2018-12-19 整合巨量資料與計算型智慧技術探討預鑄構件施作難易程度分級、勞工成本管控以及人力派遣最佳化之研究(II);Integrating Precast Big Data and Computational Intelligence to Classify Construction Difficulty, Manage Direct Labor Costs, and Optimize Manpower Allocation(Ii) 陳介豪
    2018-12-19 整合建築資訊模型與知識本體論以輔助消防安全設備自動化審查之研究;Integrating Building Information Modeling and Ontological Modeling to Facilitate Automated Fire Safety Equipment Reviews 王翰翔
    2018-12-19 橋梁管理系統自動化資料偵錯機制之建立;Establishing Automated Error Data Detection Mechanisms for Bridge Management System 姚乃嘉
    2018-08-22 營建工程S進度曲線(S-curve)建立方式與審查原則之研究;Development Principles and Review Criteria of S-curve for Construction Projects 劉心慧; Liu, Hsin-Hui
    2018-08-21 天然災害後橋梁特別檢測及修復優選排序模式之研究;A Model for Prioritizing Bridges for Damage Inspection and Rehabilitation after Natural Disasters 張榮安; Jallow, Mustapha
    2018-08-20 公共工程因工期展延增加監造服務費相關問題之研究;A Study of Problems Related to Supervision Fee Increase in Public Works due to Extension of Construction Duration 洪鈺芝; Hong, Yu-Chih
    2018-08-20 政府委託民間機構實施大型都市更新案例之研究;A Study on Large-Scale Urban Renewal Project Performed by Private Sector 黃瑄博; Huang, Hsuan-Po
    2018-08-17 橋梁管理資訊系統智慧型資料偵錯工具之建立;Establishment of Error Data Detection Mechanisms for Bridge Management System 張欣旻; Jhang, Sin-Min
    2018-08-06 建築工程不同階段施工合理工期推估模式之研究;Estimation approaches of reasonable construction duration in different stages of building projects 范姜逸珊; Chiang, Stella Fan

    Showing items 111-120 of 542. (55 Page(s) Totally)
    << < 7 8 9 10 11 12 13 14 15 16 > >>
    View [10|25|50] records per page

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明