中大學術數位典藏-NCU Institutional Repository-提供博碩士論文、考古題、期刊論文、研究計畫等下載:
English  |  正體中文  |  简体中文  |  Items with full text/Total items : 94201/94201 (100%)
Visitors : 81852049      Online Users : 2556
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version
    Research Project [127/127]
    journal & Dissertation [24/24]
    retired tests [42/42]

    Collection Statistics

    Item counts issued in 3 years: 31(8.47%)
    Items With Fulltext: 366(100.00%)

    Download counts of the item
    Download times greater than 0: 366(100.00%)
    Download times greater than 100: 363(99.18%)
    Total Bitstream Download Counts: 324284(70.30%)

    Last Update: 2026-06-29 05:25


    Top Upload

    Loading...

    Top Download

    Loading...

    RSS Feed RSS Feed
    Jump to a point in the index:
    Or type in a year:
    Ordering With Most Recent First Show Oldest First

    Showing items 111-120 of 366. (37 Page(s) Totally)
    << < 7 8 9 10 11 12 13 14 15 16 > >>
    View [10|25|50] records per page

    DateTitleAuthors
    2019-06-24 國內BIM/4D應用作業原則建立之研究;Guideline Development of BIM/4D Applications for Owners 陳信佑; Chen, Hsin-Yu
    2019-01-25 我國重大公共工程停工解約原因分析與預防措施之研擬;Causes and Responses of Contract Suspension and Termination for Large and Important Construction Projects 張宸样; Chang, Chen-Yang
    2019-01-25 運用巨量資料與系統模擬建構預鑄產業人力彈性運用之決策評估模型;Integrating precast big data and system simulation to improve manpower allocation for construction precast production 鄭鈞耀; Cheng, Jiun-Yao
    2019-01-21 可行性研究報告質量管理研究 - 以越南湄公河三角洲為例;A research on quality management of feasibility study reports - A case study of Mekong Rive Delta, Vietnam 張河世剛; Cuong, Truong Ha The
    2019-01-21 公部門組織導入BIM推動策略與決策評估模式之研究;A Study on Developing BIM Implementation Strategies and Decision Evaluation Model for Public Sector Organizations 周宏宇; Chou, Hung-Yu
    2018-08-22 營建工程S進度曲線(S-curve)建立方式與審查原則之研究;Development Principles and Review Criteria of S-curve for Construction Projects 劉心慧; Liu, Hsin-Hui
    2018-08-21 天然災害後橋梁特別檢測及修復優選排序模式之研究;A Model for Prioritizing Bridges for Damage Inspection and Rehabilitation after Natural Disasters 張榮安; Jallow, Mustapha
    2018-08-20 公共工程因工期展延增加監造服務費相關問題之研究;A Study of Problems Related to Supervision Fee Increase in Public Works due to Extension of Construction Duration 洪鈺芝; Hong, Yu-Chih
    2018-08-20 政府委託民間機構實施大型都市更新案例之研究;A Study on Large-Scale Urban Renewal Project Performed by Private Sector 黃瑄博; Huang, Hsuan-Po
    2018-08-17 橋梁管理資訊系統智慧型資料偵錯工具之建立;Establishment of Error Data Detection Mechanisms for Bridge Management System 張欣旻; Jhang, Sin-Min

    Showing items 111-120 of 366. (37 Page(s) Totally)
    << < 7 8 9 10 11 12 13 14 15 16 > >>
    View [10|25|50] records per page

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明