中大機構典藏-NCU Institutional Repository-提供博碩士論文、考古題、期刊論文、研究計畫等下載:
English  |  正體中文  |  简体中文  |  Items with full text/Total items : 83776/83776 (100%)
Visitors : 59696938      Online Users : 793
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope 查询小技巧:
  • 您可在西文检索词汇前后加上"双引号",以获取较精准的检索结果
  • 若欲以作者姓名搜寻,建议至进阶搜寻限定作者字段,可获得较完整数据
  • 进阶搜寻
    Research Project [98/98]
    journal & Dissertation [77/77]
    retired tests [179/179]

    类别统计

    Item counts issued in 3 years: 87(11.08%)
    Items With Fulltext: 785(100.00%)

    Download counts of the item
    Download times greater than 0: 785(100.00%)
    Download times greater than 100: 753(95.92%)
    Total Bitstream Download Counts: 500462(73.49%)

    Last Update: 2025-11-24 07:08


    上传排行

    数据加载中.....

    下载排行

    数据加载中.....

    RSS Feed RSS Feed
    跳至:
    或输入年份:
    由新到旧排序 由最旧的开始

    显示项目141-150 / 785. (共79页)
    << < 10 11 12 13 14 15 16 17 18 19 > >>
    每页显示[10|25|50]项目

    日期题名作者
    2021-06-16 以太陽能與風能電氣化高速公路運輸;Electrification of Highway Transportation with Solar and Wind Energy 阮凡克; Can, Nguyen Van
    2021-06-15 運用企業架構為化學產業整合精實製造、數位化及永續發展;Using Enterprise Architecture to Integrate Lean Manufacturing, Digitalization, and Sustainability for Chemical Industries 廖明輝; Liao, Ming-Hui
    2021-01-28 以動態X ?-R 管制圖判定塗布機異常現象之先導因子;Using Dynamic X ?-R control charts to determine leading indicators for Coater machine Anomaly 詹秉寰; Chan, Ping-Huan
    2021-01-14 基於LSTM方法於建置預診斷與健康管理模型—以塗佈機為例;Developing a Prognostics and Health Management Model Based on LSTM Approach – A Case Study of Coating Machine 陳嘉瑩; Chen, Jia-Ying
    2021-01-06 運用成套分批生產工單改善機械精密加工如期解繳 張志瑞; Chang, Chih-Jui
    2020-08-20 人口密度對於賣家決策之影響;The Impact of Density of Population on Seller’s Decision 廖恬櫻; Liao, Tien-Ying
    2020-08-20 利用異常檢測在串流資料建立預警系統;Establishing an early warning system on streaming data by anomaly detection 沈劭洋; Shen, Shao-Yang
    2020-08-19 以多屬性法則研究TFT-LCD廠的 RGV之選取Cassette問題 洪楷力; Hung, Kai-Lee
    2020-08-18 以分支定界法求取具時間窗口與群組限制之單一機台批次最小化總完工時間之排程問題;A Branch and Bound Algorithm for a Single Machine Batch Scheduling Problem with Time Window and Job Family Constraints to Minimize Total Completion Time 林欣儀; Lin, Hsin-Yi
    2020-08-18 以分支定界法求解具批量機台與時間延滯之零工式生產排程問題;A Branch and Bound Algorithm for Job Shop Problem with a Batch Machine and Time-Lags 相虹; Hung, Hsiang

    显示项目141-150 / 785. (共79页)
    << < 10 11 12 13 14 15 16 17 18 19 > >>
    每页显示[10|25|50]项目

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明