中大機構典藏-NCU Institutional Repository-提供博碩士論文、考古題、期刊論文、研究計畫等下載:
English  |  正體中文  |  简体中文  |  Items with full text/Total items : 78937/78937 (100%)
Visitors : 39424635      Online Users : 596
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version
    Research Project [127/127]
    journal & Dissertation [23/23]
    retired tests [42/42]

    Collection Statistics

    Item counts issued in 3 years: 40(11.76%)
    Items With Fulltext: 340(100.00%)

    Download counts of the item
    Download times greater than 0: 340(100.00%)
    Download times greater than 100: 331(97.35%)
    Total Bitstream Download Counts: 244396(68.46%)

    Last Update: 2024-09-01 06:44


    Top Upload

    Loading...

    Top Download

    Loading...

    RSS Feed RSS Feed
    Jump to a point in the index:
    Or type in a year:
    Ordering With Most Recent First Show Oldest First

    Showing items 26-50 of 340. (14 Page(s) Totally)
    << < 1 2 3 4 5 6 7 8 9 10 > >>
    View [10|25|50] records per page

    DateTitleAuthors
    2022-08-22 統包模式下預鑄建築設計流程中導入預鑄BIM元件之研究;Adopting Prefabrication BIM Components in Design Flow for Prefabrication Buildings under Design-Build Approach 李侑學; Li, You-Syue
    2022-08-11 運用SOMCM分群演算法開發設計雲端智慧平台之營運維護產業介面-以桃園市某園區為例;Establishing smart cloud-IoT interface for project operation and maintenance using SOMCM algorithm – An empirical study for Taoyuan industrial park 吳凱媛; Wu, Kai-Yuan
    2022-08-06 以語音查詢重點橋梁資訊之初步研究;A Preliminary Study on Searching Crucial Bridge Information Applying Voice Query Function 林楷鈞; Lin, Kai-Jun
    2022-08-04 疫情衝擊下促參契約權利義務調整之研究 - 以案例實證為核心 黃貫哲; Huang, Guan-Jhe
    2022-08-01 以IDEF0輔助營造廠施工階段BIM應用選擇與執行流程之研究;Analyzing BIM Uses Selection and Implementation Processes of Construction Companies in Construction Stage Based on IDEF0 Approach 許心瑜; Hsu, Hsin-Yu
    2022-07-27 改善實獲時程方法以提升工期推估準確度之研究;Improving Earned Schedule Method to Enhance the Accuracy of Duration Forecasting 陳雨昕; Chen, Yu-Hsin
    2022-07-15 專業營造廠商監督管理能力對品質成本影響之探討 -以柔性鋪面工程為例 黃又霖; HUANG, YU-LIN
    2022-06-30 我國營造業承攬管理安全衛生法規之研析 吳柔欣; WU, JOU-HSIN
    2022-06-28 政府採購法停權制度修法後與實務經驗之間契合與歧異之探討;Empirical study on the latest suspension mechanism by Government Procurement Act 蔡佩君; Tsai, Pei-Chun
    2022-06-16 運用深度卷積神經網絡 建立H 型鋼構件噴塗厚度分類系統之研究;Automatic H-shaped steel coating thickness classification using deep convolution neural network 姜昱任; Chiang, Yu-Jen
    2022-01-25 以分包商角度探討對營造廠報價行為策略之研究;A study towards quotation impact factors for general contractor: a viewpoint from private sectors 侯籹廷; Hou-Ju-Ting
    2022-01-25 探討影響台灣工程顧問公司落實法律遵循反貪腐關鍵因素之研究 黃勤瑞; Rui, Wong Qin
    2022-01-25 運用關聯法則探討協力廠商對營造廠報價行為之研究;Exploring association rules for subcontractors’ quotation behavior to general contractor in Taiwan construction industry 李依德; Lee, Yi-De
    2022-01-24 「工程慣例」認定標準與分析方法之研究- 以常見工程爭議為核心 黃俐璇; Syuan, Huang-Li
    2022-01-24 國內時程網圖健康度評估指標建立之研究;A Study on Developing Evaluation Indicators for Construction Schedule Network Health 劉亮君; Liu, Liang-Chun
    2021-08-24 台灣基於需求的社會住房提供和投資途徑;NEED-BASED PROVISION AND INVESTMENT PATHWAYS OF SOCIAL HOUSING IN TAIWAN 維蒂亞; Azzizi, Vidya Trisandini
    2021-07-30 臺灣地區車行橋下部結構劣化與水系關聯性之研究;A Study on the correlation between deterioration of substructure of car bridges and water systems in Taiwan 陳品翔; Chen, Pin-Shiang
    2021-07-27 非正式化住居改造專案因應氣候變遷作?之研究—以三個東南亞國家?例;Analyzing Informal Settlement Upgrading Projects for Climate Change in Three Southeast Asia Countries 游俊寶; Poh, Yew Chun
    2021-07-14 營造業職業災害訴訟民刑事責任態樣分析;Analyzing civil and criminal liabilities of occupational hazard litigations in the construction industry 許育誠; Xu, Yu-Cheng
    2021-07-08 建立建築工程應用BIM技術預算編列原則之研究;A Study on Developing Principles of Estimating BIM Budgets for Building Construction Projects 劉飛翎; Liu, Fei-ling
    2021-07-07 應用價值工程於捷運車站設施適應高齡化更新之研究;Value Engineering Analysis on Metro Rapid Transit Station Facilities for Aged Users 謝智恆; Hsieh, Chih-Heng
    2021-07-05 BOT專案興建階段公私法交錯問題之研究-以臺北文化體育園區大型室內體育館開發計畫案(臺北大巨蛋)為例 黃翊哲; Huang, Yi-Che
    2021-03-16 Analyzing Early Termination and Transfer of BOT Infrastructure Projects in Taiwan;Analyzing Early Termination and Transfer of BOT Infrastructure Projects in Taiwan 王暐翔; Wang, Wei-Hsiang
    2021-01-28 探討公司治理影響臺灣工程顧問公司關鍵因素之研究;Exploring the impact factors toward corporate governance for consulting engineering companies in Taiwan 楊粢涵; Yang, Tzu-Han
    2021-01-28 營造業安全衛生標示對人員注意力影響之研究 黃建豪; HUANG, CHIEN-HAO

    Showing items 26-50 of 340. (14 Page(s) Totally)
    << < 1 2 3 4 5 6 7 8 9 10 > >>
    View [10|25|50] records per page

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明