English  |  正體中文  |  简体中文  |  Items with full text/Total items : 80990/80990 (100%)
Visitors : 41634671      Online Users : 2211
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version

    Community Statistics


    Item counts issued in 3 years: 104(9.38%)
    Items With Fulltext: 1109(100.00%)

    Download counts of the item
    Download times greater than 0: 1109(100.00%)
    Download times greater than 100: 994(89.63%)
    Total Bitstream Download Counts: 587590(1.45%)

    Last Update: 2024-11-21 11:12

    Top Upload

    Loading...

    Top Download

    Loading...

    RSS Feed RSS Feed
    Jump to a point in the index:
    Or type in a year:
    Ordering With Most Recent First Show Oldest First

    Showing items 401-450 of 1109. (23 Page(s) Totally)
    << < 4 5 6 7 8 9 10 11 12 13 > >>
    View [10|25|50] records per page

    DateTitleAuthors
    2014-07-17 利用模擬探討自行車租賃系統檔板個數問題;Using simulation to consider quantities of dock in bike sharing system 李慧貞; LI,HUI-ZHEN
    2014-07-17 買賣雙方依賴關係與影響策略對採購績效之影響 鍾靜文; Chung,Ching-wen
    2014-07-17 模擬公共自行車之車輛調度作業;Using Simulation to Solve Bike-Sharing Dynamic Reposition Problem 許彤安; Hsu,Tung-An
    2014-07-17 應用環境品質機能展開和失效模式與效應分析於工業電腦之協同設計;Applying QFDE and FMEA method to collaborative design analysis Take the IPC product as the example 梁新鴻; Liang,Hsin-Hung
    2014-07-16 一整合分析方法以建構模組化產品家族;An Integrated Method for the Construction of Modular Product Family 蔡孟諺; Cai,Meng-yan
    2014-07-15 汽車產業需求鏈優化與設計;Demand Chain Management process improvement and design in Automobile industry 巫衍諦; Wu,Yen-di
    2014-07-15 應用群組技術結合雲端伺服器與ARIS平台於雲端製程;Applying Group Technology, Cloud Server and ARIS Platform for Demonstrating Cloud Manufacturing 廖悅婷; Liao,Yueh-ting
    2014-07-09 淘寶網商店街女裝B2C電子商務顧客之流失分析;A Churn Analysis of Business-to-Customer e-Commerce of Women′s Apparel at Taobao Shop Street 林鈺淵; Lin,Yu-yuan
    2014-07-04 應用雲端製造優化汽車產業供應鏈;Applying Cloud Manufacturing to optimize Auto Industry Supply Chain 邱佳玲; Chiu,Jia-ling
    2014-07-02 使用凝聚型階層式分群法對流成行資料分群;Agglomerative Hierarchical clustering with the string data 廖秋閔; Liao,Chiu-Min
    2014-07-02 探討原生製造商涉入再製造與政府補貼之影響;Analysis of Competition with OEM-Remanufactured Products and the Effect of Government Subsidies 周士琦; Jhou,Shih-Chi
    2014-07-01 應用品質機能展開及設計結構矩陣於可穿戴式科技之模組化產品設計;Applying QFD and DSM in Wearable Technology for Modular design method 吳宗勳; Wu,Tzung-Shiun
    2014-06-25 Center-based clustering with the string data 許佳雯; Syu,Jia-Wun
    2014-06-19 價格波動下的訂購策略;The Ordering Policy under Fluctuating Cost 盛加雯; Sheng,Chia-Wen
    2014-06-03 漏檢因素之資料探勘分析與探討-以X公司晶圓級晶片尺寸封裝製程為例 葉明淵; Yeh,Ming-yuan
    2014-05-01 103年工業管理研究所(乙組)-生產與作業管理-入學考試題 工業管理研究所(乙組)
    2014-05-01 103年工業管理研究所(乙組)-作業研究-入學考試題 工業管理研究所(乙組)
    2014-05-01 103年工業管理研究所(乙組)-統計學-入學考試題 工業管理研究所(乙組)
    2014-03-10 以通路協調觀點探討合約為基礎之靜態及動態封閉式供應鏈管理;Contract-Based Static and Dynamic Closed-Loop Supply Chain Management: A Channel Coordination Perspective 陳振明
    2014-03-10 逆向供應鏈之回收通路與機制設計;Channel Design and Mechanisms Design in a Reversed Supply Chain 陳振明
    2014-01-17 考慮固定週期批量之物料需求規劃(MRP) 生產前置時間最佳化; 考慮固定週期批量之物料需求規劃(MRP) 生產前置時間最佳化 董嘉衛; Tung,Chia-wei
    2014-01-03 群聚效應對店家位置的影響; Cluster effect on the stores location 石健佑; Shih,Chien-you
    2013-12-01 以通路協調觀點探討合約為基礎之靜態及動態封閉式供應鏈管理;Contract-based static and dynamic closed-loop supply chain management: a channel coordination perspective 陳振明
    2013-12-01 同時考慮「顧客需求日期」及「製造商承諾日期」之 LED 供應鏈策略性產能規劃;Strategic Capacity Planning for LED Supply Chains with Simultaneous Consideration of Both &quot;Customer Request Dates&quot; and &quot;Manufacturer Commit Dates&quot; 王啟泰
    2013-12-01 利用彈性揀貨途程來改善順序式分區揀貨與同步順序式分區揀貨的績效(I);Improving the Performance of Sequential-Zone Picking and Synchronized Sequential-Zone Picking with Flexible Picking Routes 何應欽
    2013-12-01 促銷成本分攤與信用期在距離相依需求情境下對供應鏈合作之影響;Promotion cost sharing and credit period policy under distance-dependent demand on supply chain coordination 沈國基
    2013-12-01 逆向供應鏈之回收通路與機制設計;Channel Design and Mechanisms Design in a Reversed Supply Chain 陳振明
    2013-07-31 ERP為基準碳足跡計算之觀念性架構發展; Developing a Conceptual Framework for ERP-enabled Carbon Footprint Calculation 劉家伶; Ling,Liu Jia
    2013-07-29 代工品項遴選準則之建立-以製藥產業P公司為例 范楚函; Chu-Han-Fan
    2013-07-26 作業基礎制碳足跡方法-以作業制成本法為基礎發展產品碳足跡計算之方法; Activity Based Carbon Footprint – a method for product carbon footprint calculation using Activity-Based Costing 黃國誠; Huang,Guo-cheng
    2013-07-26 應用設計結構矩陣於產品平台開發; Applying Design Structure Matrix for Product Platforms Development 洪麒豐; Hong,Qi-Fong
    2013-07-24 考慮非均值隨機淘汰時間之存貨政策; Inventory ordering policy with consideration of nonhomegeneous random obsolete time 馮經輝; Feng,Jing-hui
    2013-07-24 具多區塊儲位理貨區之越庫作業區域的播種式揀貨問題 張家諺; Chang,Chia-yen
    2013-07-24 具多排暫存格之越庫作業區域的摘取式揀貨作業探討 鐘怡均; Chung,Yi-chun
    2013-07-24 越庫作業之訂單選取與理貨區指派作業的探討 林頌典; Lin,Sung-Tien
    2013-07-24 越庫作業區域之進貨與理貨作業的探討 楊宗翰; Yang,Tsung-Han
    2013-07-23 允許缺貨後補之產能擴張問題; Capacity expansion problems with backlogging 李承浩; Lee,Cheng-Hao
    2013-07-23 在考量服務水準之線性市場中兩家競爭零售商之最佳決策問題; Optimal Decision Problem between two Competition Retailers with Consideration of Service Level in a Linear Market 楊嵩灝; Yang,Sung-hao
    2013-07-23 在隨機的回收數量下逆物流中的最佳生產量; An Optimal Production in Reverse Logistics with Consideration of Stochastic Return Quantity 呂錏泓; Lu,Ya-hung
    2013-07-22 在數量彈性合約之下考慮逆向物流的通路協調; Channel coordination of reverse logistic under quantity flexibility contract 楊士驊; Yang,Shih-hua
    2013-07-19 考量機台彈性維護限制之平行機台求極小化總完工時間排程問題; Parallel machine scheduling with flexible maintenance activities for minimizing total completion time 許文志; Hsu,Wen-Chih
    2013-07-19 利用分支界限法求具有機台可用時間限制與工作可分割特性的平行機台排程問題之最佳解; A Branch and Bound Algorithm for Parallel Machine Scheduling with Availability and Job Preemption Constraints 鄭善尉; Cheng,Shan-wei
    2013-07-19 具多次彈性維護限制之單一機台求極小化總完工時間排程問題; Single Machine Scheduling with Flexible Maintenance Periods for Minimizing Total Completion Time 李明倫; Lee,Min-Lun
    2013-07-19 逆向物流系統中的最佳解於WEEE為例; Optimization of reverse logistics systems in WEEE 阮氏凊春;
    2013-07-15 LED磊晶片與晶粒製造之產能規劃; Capacity Planning for LED Epiwafer and Die Manufacturing 徐清鴻; Hsu,Ching-Hung
    2013-07-11 應用失效模式及效應分析與設計結構矩陣 於工業電腦之協同設計; Applying Failure Mode and Effects Analysis and Design Structure Matrix to Collaborative IPC Design 郭道東; Kuo,Dao-Dong
    2013-07-08 考量客戶期望日期之供應鏈管理; Conducting Supply Chain Planning with Customer Request Dates 洪婉湄; Hong,Mei Woan
    2013-07-03 團隊成員認知風格影響新產品開發績效機制之研究; The Impact of Team Member’s Cognitive Style on New Product Development Performance 翁啟祐; Weng,Chi-yu
    2013-07-02 封閉式供應鏈之逆向通路設計; Reversed Channel Design In A Closed-Loop-Supply-Chain 紀竺雨; Chi,Chu-yu
    2013-07-02 探討政府涉入逆向供應鏈之新品與再製品的分析; Analysis of New and Remanufactured Products with the Governmental subsidies in a Reversed Supply Chain 鄭郁儒; Cheng,Yu-ju

    Showing items 401-450 of 1109. (23 Page(s) Totally)
    << < 4 5 6 7 8 9 10 11 12 13 > >>
    View [10|25|50] records per page

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明