中大機構典藏-NCU Institutional Repository-提供博碩士論文、考古題、期刊論文、研究計畫等下載:
English  |  正體中文  |  简体中文  |  Items with full text/Total items : 81570/81570 (100%)
Visitors : 46861535      Online Users : 601
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version
    Research Project [96/96]
    journal & Dissertation [77/77]
    retired tests [179/179]

    Collection Statistics

    Item counts issued in 3 years: 64(8.40%)
    Items With Fulltext: 762(100.00%)

    Download counts of the item
    Download times greater than 0: 762(100.00%)
    Download times greater than 100: 702(92.13%)
    Total Bitstream Download Counts: 454256(73.14%)

    Last Update: 2025-04-18 11:07


    Top Upload

    Loading...

    Top Download

    Loading...

    RSS Feed RSS Feed
    Jump to a point in the index:
    Or type in a year:
    Ordering With Most Recent First Show Oldest First

    Showing items 301-325 of 762. (31 Page(s) Totally)
    << < 8 9 10 11 12 13 14 15 16 17 > >>
    View [10|25|50] records per page

    DateTitleAuthors
    2015-07-24 越庫作業之進貨區相關作業問題探討 陳泓融; Hong-rong-Chen
    2015-07-21 考慮使用者維護費用之折價貼換交易策略;Trade-in strategy by Considering User Maintenance Costs 許雅棋; Hsu,Ya-Chi
    2015-07-21 多機台間不具有儲存空間下極小化總延遲時間之流程式生產排程問題;Minimizing Total Tardiness in Flow Shop Scheduling Problem with Blocking 黃培軒; Huang,Pei-shiuan
    2015-07-21 考量碳政策之自行車零組件供應商選擇;Selection of Bicycle Component Supplier Considering Carbon Policies 李紹鵬; Li,Shao-Peng
    2015-07-17 運用「基因K-Means演算法」劃分混合客服中心客戶群;Planning Customer Segmentation in Blended Contact Center Using Genetic K-Means Algorithm 裴廣志; Perez,Kenneth Bolido
    2015-07-15 研究廢乾電池回收利用之逆物流網路;Study on Refurbishing Spent Dry Cell Batteries in a Reverse Logistics Network 黎俊言; Jyen-Yan Li
    2015-07-14 考量碳排放管理之玻璃廠生產排程;Production Scheduling for Glassware Manufacturing Considering Carbon Emissions 連品婷; Lien,Pin-ting
    2015-07-14 自動控制產品維修保固策略規劃;Strategic Planning for Maintenance and Warranty Policies of Automatic Control Electronic Devices 蔣涵婷; Chiang,Han-Ting
    2015-07-09 一整合方法設計防護性穿戴科技以及任務支援系統;An Integrated Method for Designing the Protection Wearable Technology and Support System 廖思婷; Liao,Sih-ting
    2015-07-09 一整合方法設計穿戴式醫療裝置之產品服務系統;An Integrated Method for Designing Wearable Medical Device-Service System 潘詩涵; Pan,Shih-han
    2015-07-07 一整合方法設計穿戴式健康裝置之產品服務系統;An Integrated Method for Designing Wearable Health Device-Service System 杜珈芸; Tu,Chia-yun
    2015-07-07 具工作可切割特性與機台可用區間及合適度限制求最小化總完工時間之平行機台排程問題;Preemptive Parallel Machine Scheduling with Machine Availability and Eligibility Constraints to Minimize Total Completion Time 鮑可軒; Pao,Ko-hsuan
    2015-07-07 探討不同回收成本結構下製造商的逆向通路決策;Reverse Channel Decisions Under Different Collection Cost Structures 王婷麗; Wang,Ting-li
    2015-07-06 以交易數量為基礎之加權關聯規則;Quantity-based association rules with weights 李姿瑩; Li,Tzu-Ying
    2015-07-06 晶圓級封裝晶粒檢測自動化研究 -以X公司最終檢驗站為研究對象 蕭毓則; Hsiao,Yu-tse
    2015-07-06 結合主成分分析之貝氏分類模型;Naive Bayes classifier with Principal Components Analysis for continuous attributes 吳若平; Wu,Jo-Ping
    2015-07-06 樹狀資料之中心集群分析;Center-based clustering with tree structured data 林政延; Lin,Zheng-Yan
    2015-06-30 以同步工程方法論建構新產品開發專案之流程 羅煥穎; Lo,Huan-Ying
    2015-06-29 一整合方法規劃汽車共享之服務系統;An Integrated Method for Planning Car-Sharing Service System 郭譯謙; Kuo,Yi-Chien
    2015-06-25 影響半導體產業知識移轉因素之研究 (以半導體封裝為例) 江岱凌; Jiang,Dai-Ling
    2015-06-22 新產品在預算限制及模糊與隨機價值期限下多類別與多等級之專案選擇;Multi-category and Multi-standard Project Selection with Fuzzy and Stochastic Value-based Time Limit for Creating the Prestige of New Product 徐文傑; Hsu,Wen-chieh
    2015-01-26 以模擬研究自行車租賃系統之多輛搬運車調度問題;A Simulation Study of Vehicle Dispatch to Reposition Bikes in a Bike-sharing System 林昱辰; Lin,Yu-chen
    2014-07-28 以ERP為基準之單一產品碳足跡計算之概念性架構發展-以幫浦製造流程為例;Developing an ERP-based Conceptual Framework for Single Product Carbon Footprint Calculation-A Case Study of the Pump Production Process. 楊亞臻; Yang,Ya-Chen
    2014-07-28 平行機台排程問題下考量工單釋放時間與機台適合度之最小化總完工時間;Identical Parallel Machine Scheduling Problem with Release Dates and Machine Eligibility Restriction to Minimize Total Completion Time 蔡承益; Tsai,Cheng-I
    2014-07-28 考量平行機台之彈性維護週期求極小化總完工時間排程問題;Parallel Machine Scheduling with Flexible Maintenance Activity Periods for Minimizing Total Completion Time 李彥漢; Li,Yen-han

    Showing items 301-325 of 762. (31 Page(s) Totally)
    << < 8 9 10 11 12 13 14 15 16 17 > >>
    View [10|25|50] records per page

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明