English  |  正體中文  |  简体中文  |  Items with full text/Total items : 80990/80990 (100%)
Visitors : 42119667      Online Users : 1529
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version

    Community Statistics


    Item counts issued in 3 years: 50(9.23%)
    Items With Fulltext: 542(100.00%)

    Download counts of the item
    Download times greater than 0: 542(100.00%)
    Download times greater than 100: 495(91.33%)
    Total Bitstream Download Counts: 326670(0.80%)

    Last Update: 2024-12-03 17:18

    Top Upload

    Loading...

    Top Download

    Loading...

    RSS Feed RSS Feed
    Jump to a point in the index:
    Or type in a year:
    Ordering With Most Recent First Show Oldest First

    Showing items 276-300 of 542. (22 Page(s) Totally)
    << < 7 8 9 10 11 12 13 14 15 16 > >>
    View [10|25|50] records per page

    DateTitleAuthors
    2012-12-01 氣候變遷環境下永續性工程之因應研究-以道路運輸工程為例-氣候變遷環境下永續性工程安全防災之因應研究-以道路運輸工程為例(III);Strategies for Disaster Prevention in Sustainable Construction in Response to the Global Climate Change Issues – Example of Roadway Construction 姚乃嘉
    2012-12-01 氣候變遷環境下永續性工程之因應研究-以道路運輸工程為例-氣候變遷環境下永續性工程成本效益之因應研究-以道路運輸工程為例(III);Strategies for Using Cost Efficiency Analysis in Sustainable Construction in Response to the Global 陳介豪; 張又升
    2012-12-01 氣候變遷環境下永續性工程之因應研究-以道路運輸工程為例-氣候變遷環境下永續性工程資源循環利用之因應研究-以道路運輸工程為例(III);Strategies for Using [[Recycle Materials]] in Sustainable Construction in Response to the Global Climate Change Issues – Example of Roadway Construction 黃榮堯
    2012-12-01 智慧型計算應用於不動產估價模式自動化之研究;Automating Appraisal Model for Real Estate Using Computational Intelligence 陳介豪
    2012-12-01 極端氣候下複合性災害防治之研究-極端氣候下因應複合性災害橋梁工程調適策略之研究( III );Adaptation Strategies of Bridge Engineering in Response to Compound Disasters Caused by Extreme Weather Conditions 姚乃嘉; 陳介豪; 蔡龍治; 黃榮堯; 許文科; 蘇木春
    2012-12-01 預防性維護導向橋梁劣化關聯規則之研究;Preventive Maintenance Approach -A Study of Association Rules for Bridge Deterioration 黃榮堯
    2012-12-01 應用本體論於營造安全規範半自動辨識之研究;Application of Ontology to Semi-Automated Identification of Construction Safety Specification 王翰翔
    2012-09-01 氣候變遷環境下永續性工程之因應研究-以道路運輸工程為例-氣候變遷環境下永續性工程安全防災之因應研究-以道路運輸工程為例(III);Strategies for Disaster Prevention in Sustainable Construction in Response to the Global Climate Change Issues – Example of Roadway Construction 姚乃嘉
    2012-09-01 極端氣候下複合性災害防治之研究-極端氣候下因應複合性災害橋梁工程調適策略之研究( III );Adaptation Strategies of Bridge Engineering in Response to Compound Disasters Caused by Extreme Weather Conditions 姚乃嘉; 許文科; 蘇木春; 陳介豪; 蔡龍治; 黃榮堯
    2012-09-01 智慧型計算應用於不動產估價模式自動化之研究;Automating Appraisal Model for Real Estate Using Computational Intelligence 陳介豪
    2012-09-01 氣候變遷環境下永續性工程之因應研究-以道路運輸工程為例-氣候變遷環境下永續性工程成本效益之因應研究-以道路運輸工程為例(III);Strategies for Using Cost Efficiency Analysis in Sustainable Construction in Response to the Global 陳介豪; 張又升
    2012-09-01 交通運輸工程節能減碳規劃設計手冊研究與編訂 黃榮堯
    2012-09-01 氣候變遷環境下永續性工程之因應研究-以道路運輸工程為例-氣候變遷環境下永續性工程資源循環利用之因應研究-以道路運輸工程為例(III);Strategies for Using [[Recycle Materials]] in Sustainable Construction in Response to the Global Climate Change Issues – Example of Roadway Construction 黃榮堯
    2012-09-01 預防性維護導向橋梁劣化關聯規則之研究;Preventive Maintenance Approach -A Study of Association Rules for Bridge Deterioration 黃榮堯
    2012-09-01 考量浮時消耗之時程延遲分析方法之建立;Developing a Schedule Delay Analysis Method with Considering Float Consuming 楊智斌
    2012-08-28 維護管理導向橋梁生命週期文件管理系統之建立;Establishing A Life-Cycle Document Management System for Bridge Maintenance 唐楷勝; Tang,Kai-Sheng
    2012-08-27 新建建築工程大宗材料用量分析之研究;Investigation of Factors Affecting the Material Usage for Construction of a New Building in Taiwan 邱佳淳; Chiu,Chia-chun
    2012-08-27 道路設計因子對行車碳排放影響之研究;A study of the influence of highway design factors on vehicle carbon emissions in Taiwan 佘品蓁; She,Ping-chen
    2012-08-11 臺北捷運高架車站聯合開發佈設捷運設施與開發效益合理性之研究;The study of the rationality and benefit of the joint development of the elevated station Taipei Metro Mass Rapid Transit 葉松芳; Yeh,Sung-Fang
    2012-07-30 河川工程因應極端氣候衝擊與調適策略之研究;The Impact and Adaptation Strategy of ExtremeClimatic Events on River Engineering 謝宜君; Hsieh,Yi-chun
    2012-07-27 公共工程導入爭議審議委員會(DB)之研究;The research of introducing into Dispute Boards in public works. 李侑蒼; Li,Yu-tsang
    2012-07-27 以典型組合屋進行地震災後重建之研究-以印尼為例;Post-Disaster Reconstruction Using Typical Assembled Houses after Earthquakes in Indonesia 娥雅妮; Nurma,Eryani
    2012-07-25 BOT專案移轉階段風險管理研究-以台北車站特定專用區交通九號用地BOT開發案為例;Risk Management in Transfer Stage of BOT Project- Based on Taipei Station Parcel 9 BOT Project 林華駿; Lin,Dany
    2012-07-25 應用RGB影像處理模式於辨識地理環境變異之研究;Developing a RGB recognition model for the disaster caused by Typhoon Morakot in Taiwan 李樹璇; Lee,Shu-Xuan
    2012-07-25 環境保護協定應用於營建噪音導致環境破壞處理之研究;A Study of the Application of Environmental Protection Agreement on the Damage Caused by Construction Noise 柯婷榕; Ke,Ting-rong

    Showing items 276-300 of 542. (22 Page(s) Totally)
    << < 7 8 9 10 11 12 13 14 15 16 > >>
    View [10|25|50] records per page

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明