中大機構典藏-NCU Institutional Repository-提供博碩士論文、考古題、期刊論文、研究計畫等下載:
English  |  正體中文  |  简体中文  |  Items with full text/Total items : 80990/80990 (100%)
Visitors : 41268823      Online Users : 135
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version
    Research Project [127/127]
    journal & Dissertation [23/23]
    retired tests [42/42]

    Collection Statistics

    Item counts issued in 3 years: 50(14.29%)
    Items With Fulltext: 350(100.00%)

    Download counts of the item
    Download times greater than 0: 350(100.00%)
    Download times greater than 100: 300(85.71%)
    Total Bitstream Download Counts: 222316(68.51%)

    Last Update: 2024-11-17 13:25


    Top Upload

    Loading...

    Top Download

    Loading...

    RSS Feed RSS Feed
    Jump to a point in the index:
    Or type in a year:
    Ordering With Most Recent First Show Oldest First

    Showing items 1-25 of 350. (14 Page(s) Totally)
    1 2 3 4 5 6 7 8 9 10 > >>
    View [10|25|50] records per page

    DateTitleAuthors
    2024-07-30 政府有償取得公共服務政策評估架構與項目精進之研究;A Study on Improving Policy Assessment Framework and Items for Paid PPP Project 陳致佑; CHEN, Zhi-You
    2024-07-29 我國營造業本籍勞工與外籍移工重大職災資料之分析;A Comparative Analysis of Major Occupational Accident Data between Native and Migrant Workers in Taiwan′s Construction Industry 邱煜翔; Chiu, Yu-Xiang
    2024-07-23 因疫情管制措施致影響施工生產力之研究;A Study on the Impact of Pandemic Control Measures on Construction Productivity 孫尚廷; Sun, Shang-Ting
    2024-07-18 利用時間序列分析技術輔助品質成本推估模式建立之研究 - 以柔性鋪面工程為例 馮天揚; Feng, Tian_Yang
    2024-07-16 建立建築工程時程網圖輔助系統之研究;Developing An Assistant System for Construction Project Schedule Development 賴廷瑄; Lai, Ting-Hsuan
    2024-07-12 土石方收容處理場上物件特徵與擬製指向性辨識之研究 沈廉; Shen, Lian
    2024-07-01 運用SOMCM分析桃園重金屬污染農田灌溉之研究;Pattern Analysis for Heavy Metal Contamination by Irrigation in Taoyuan Farmland Using the SOMCM Approach 圖思佳; Bayarkhuu, Tugsjargal
    2024-07-01 運用譜分群分析桃園市土壤污染模式之研究;Pattern Analysis for Soil Contamination in Taoyuan City using Spectral Clustering 葛蕾蒂; Hasugian, Gladys Yolanda
    2024-06-28 社會住宅興建採用促參模式辦理之研究 -以國內現況為核心 謝昭儀; Hsieh, Chao-Yi
    2024-06-28 營建工程工作物先行使用權責歸屬之研究 季翔渝; Chi, Hsiang-Yu
    2024-01-30 探討我國工程顧問公司法令遵循制度之研究-以公司治理、反貪腐為核心;Exploring the impact factors of legal compliance systems focusing on corporate governance and anti- corruption for consulting engineering companies in Taiwan 周天昇; Eddie, Tien-sheng Chou
    2024-01-26 建築合規風險與過失致死責任之關聯性規則研究;Research on the rules associated with buildings compliance risks and gross negligence manslaughter liability 廖牧群; Liao, Mu-Chun
    2024-01-24 建築工程職安衛經費編列 與施工工項之研究 白建義; PAI, CHIEN-YI
    2024-01-22 驗屋點交專業人員職能基準發展之研究;Development of competency standards for house inspection professionals 鄭智仁; CHIH-JEN, CHENG
    2024-01-18 建構用於提升專案工期預測準確性之方法;An Approach for Enhancing Accuracy of Project Duration Forecasting 葉安娜; Hamdiyah, Ianatul
    2023-12-20 市區道路維護採用成效式契約之成效評估架構研究;A Research on the Performance Evaluation Framework for Adopting Performance Based Contracts to Urban Road Maintenance 曾俊傑; Tseng, Chun-Chieh
    2023-09-11 整合單頻全球定位系統與單晶片微控制器應用於淺層邊坡位移監測之初探;Preliminary Evaluation of Shallow Landslide Displacement Monitoring Using Single Frequency NSS Integrated with Arduino System 廖翊均; Liao, Yi-Chun
    2023-08-14 天候與自然災害影響建築工程工期之研究;A Study on the Impact of Weather and Natural Disasters on the Duration of Building Construction Projects 張芳慈; Chang, Fang-Tzu
    2023-08-08 探索和排名 MRT 維護成本的影響因素 使用粗糙集增強的 K-近鄰方法;EXPLORING AND RANKING INFLUENTIAL FACTORS IN MRT MAINTENANCE COSTS USING ROUGH SET ENHANCED K- NEAREST NEIGHBOR METHOD 安蒂娜; Utami, Andina Mugi
    2023-07-26 運用知識本體與電腦模擬技術推估品質成本之研究-以柔性鋪面工程為例 張登凱; Chang, Deng-Kai
    2023-07-24 營造業施工安全評估與風險評估制度精進之研究 何沛潔; Ho, Pei-Jie
    2023-07-12 桃園市列管農地重金屬再汙染預測模型之研究;Study on Prediction Model for Heavy Metal Recontamination in Regulated Farmland in Taoyuan City 葉明忠; Yeh, Ming-Chung
    2023-07-06 The Selection of BIM Benefit Evaluation Approaches: Theoretical Framework and Guideline 林德薇; Arwinta, Nimas Latifatul Dwi
    2023-07-06 政府採購選商納入ESG指標之研究-以工程採購為核心 曾筱雲; Zeng, Xiao-Yun
    2023-07-01 高雄國際機場擴建施工階段平行分標間界面管理作業模式之研究;A Study on Interface Management Operation Model between Parallel Subcontracts during the Construction Phase of Kaohsiung International Airport Expansion 郭裕昂; Guo, Yu-Ang

    Showing items 1-25 of 350. (14 Page(s) Totally)
    1 2 3 4 5 6 7 8 9 10 > >>
    View [10|25|50] records per page

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明