English  |  正體中文  |  简体中文  |  Items with full text/Total items : 80990/80990 (100%)
Visitors : 41644406      Online Users : 1096
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version

    Community Statistics


    Item counts issued in 3 years: 73(11.53%)
    Items With Fulltext: 633(100.00%)

    Download counts of the item
    Download times greater than 0: 633(100.00%)
    Download times greater than 100: 559(88.31%)
    Total Bitstream Download Counts: 462569(1.15%)

    Last Update: 2024-11-21 19:39

    Top Upload

    Loading...

    Top Download

    Loading...

    RSS Feed RSS Feed
    Jump to a point in the index:
    Or type in a year:
    Ordering With Most Recent First Show Oldest First

    Showing items 376-400 of 633. (26 Page(s) Totally)
    << < 11 12 13 14 15 16 17 18 19 20 > >>
    View [10|25|50] records per page

    DateTitleAuthors
    2009-06-20 主辦機關因承包商延誤履約之對策及探討; The Discussion on Government Agency's Strategies against Contractor's Delay in Performance 洪宜正; Yi Cheng
    2009-06-12 中小型土地開發商融資利息成本最佳化模式之研究 湯士胤; Shin-Yin Tang
    2009-06-12 住宅區土地開發效益最佳化模式之研究 NO 翁榮章; Jung-chang Weng
    2009-06-12 電廠大修人力指派最佳決策模式之研究-以水力電廠為例 no 丁榮堂; Jung-tang Ting
    2009-06-12 預鑄廠生產儲運最佳化模式之研究; Optimal Model of Precast Concrete Plant's Production, Storage And Transportation 張兆宇; Chao-yu Chang
    2009-06-05 鄉鎮市公所開口契約之應用-以中壢市公所為例; The application of indefinite delivery contract for township and municipal’s hall – an example for Jung-Li City Hall 廖恒德; Heng-te Fiao
    2009-06-05 高科技廠房無塵室之營建工程特殊需求探討; Investigation of Particular Construction Requirement For the Cleanroom of High-Tech Fab 李玉庭; Yu-ting Lin
    2009-05-30 國際觀光旅館先期規劃風險評估; Evaluation of Investment Risk of International Tourist Hotel 黃宗興; Zongxing Huang
    2009-05-30 以專案管理計分卡運用在建築專案執行之研究; A research on the utilization of project management scorecard in the implementation of a construction project 張岸礕; An-pi Chang
    2009-05-20 統包模式規劃設計階段影響進度之研究-以變電所工程為例; Factors Affecting Design Schedule in Turnkey Project- An Example of Primary Distribution Substation Project 吳淑惠; Shu-Hui Wu
    2009-05-15 建立營造業勞工安全管理機制-降低職業災害之研究; A Research on the Management Mechanism of Construction Safety and Health to Prevent Occupational Hazards 曲晉興; CHIN-HSING CHU
    2009-05-01 98年土木工程學系碩士在職專班-土木施工學-入學考試題 土木工程學系碩士在職專班
    2009-05-01 98年土木工程學系碩士在職專班-防災概論-入學考試題 土木工程學系碩士在職專班
    2009-01-12 工程變更設計對工程總管理費影響之研究-以建築工程為例; Quantifying the impact of change to construction project overhead 康錫川; KANG HIS CHUAN
    2009-01-12 道路零星修補及挖掘路面修復精進策略之研究; Pavement fragment repairand Pavement excavation repair Plant Operation Strategy 徐志鵬; Chih-peng Hsu
    2008-11-28 平衡計分卡制度導入建設公司經營管理模式之研究; The balanced scorecard system to induct the construction company management of research 紀明潭; Ming-tan Chi
    2008-10-09 建築基礎工程採用壁樁及其他工法成效之分析研究; Construction build to use wall-ytpe foundation and other manner results to analyze research 黃文隆; wen-lung Huang
    2008-10-09 公務機關善用資源以提升工務管理服務品質-以桃園縣政府工務處為例; Public agency makes good use of the resources take to promote the engineering supervisory service quality - by the Taoyuan County government public works department as an example 廖雅玲; Ya-ling Liao
    2008-07-12 都市焚化廠設施維護管理之研究--以台北縣八里焚化廠為例 彭競輝; Ching-Hui Peng
    2008-07-12 民間建築產業施工品質驗證制度之研究-以「建築物生產履歷」為例 鄭正義; Cheng-yi Cheng
    2008-07-12 臺北市頂樓違章建築處理探討及改善對策之研究-以市民觀點論述; The performance and research of improving the countermeasure in the Roof Annex of TAIPEI City - Describe citizen's view 黃建中; Chien-chung Huang
    2008-07-11 營建工地土石方調派最佳化模式之研究; An Optimization Model for Earthwork Allocation in a Construction Site 陳俊成; Chun-Chen Chen
    2008-07-11 機關衛生稽查人力指派最佳化模式之研究; AN OPTIMIZATION MODEL FOR MANPOWER ASSIGNMENT TO OFFICIAL AUDITING IN SANITARY AFFAIRS 葉慶仲; Ching-Chung Yeh
    2008-07-11 公園維護人力指派最佳化模式之研究; An Optimization Model For Park Maintenance Manpower Assignment 徐裕淳; Yu-chun Hsu
    2008-07-11 營建工程短期人力指派最佳化模式之研究; Optimization of Short-Term Labor Force Assignments in Construction 俞偉武; Wei-wu Yu

    Showing items 376-400 of 633. (26 Page(s) Totally)
    << < 11 12 13 14 15 16 17 18 19 20 > >>
    View [10|25|50] records per page

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明