中大機構典藏-NCU Institutional Repository-提供博碩士論文、考古題、期刊論文、研究計畫等下載:
English  |  正體中文  |  简体中文  |  Items with full text/Total items : 80990/80990 (100%)
Visitors : 42119469      Online Users : 1386
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version

    Community Statistics


    Item counts issued in 3 years: 50(9.23%)
    Items With Fulltext: 542(100.00%)

    Download counts of the item
    Download times greater than 0: 542(100.00%)
    Download times greater than 100: 495(91.33%)
    Total Bitstream Download Counts: 326670(0.80%)

    Last Update: 2024-12-03 17:18

    Top Upload

    Loading...

    Top Download

    Loading...

    RSS Feed RSS Feed
    Jump to a point in the index:
    Or type in a year:
    Ordering With Most Recent First Show Oldest First

    Showing items 76-100 of 542. (22 Page(s) Totally)
    << < 1 2 3 4 5 6 7 8 9 10 > >>
    View [10|25|50] records per page

    DateTitleAuthors
    2020-07-14 公共工程開口施工契約性質分析及履約爭議之研究-以司法判決為核心 吳禹錡; Wu, Yu-Chi
    2020-07-14 制定大型工程專案價值工程實施規範指引之研究—以捷運工程為例 黃俊; WONG, CHUN
    2020-01-20 BOT移轉階段風險分析 -以桃園北區水資源回收中心為例 吳崧豪; Wu, Sung-Hao
    2020-01-17 基於智慧城市和可持續發展概念的商業集群滿意度研究:桃園市老商業區的實證研究;A Satisfactory Study toward Business Clusters based on Smart City and Sustainability Concepts: Empirical Evidence in Taoyuan City Old Business District 康小鵬; Raharjo, Jovan Luke
    2020-01-16 建構驗屋項目與排序之研究;Exploring Preference Ranking for House Transfer Inspection Using AHP 陳柏翰; Chen, Po-Han
    2020-01-16 運用自然語言處理技術輔助工程專案合約利害關係人平台之研究;Developing Cloud Computing based Project Management Platform among Contractual Parties using Natural Language Processing Technology 陳威翰; Chen, Wei-Han
    2020-01-13 永續發展目標框架下的永續議題與公眾風險識覺治理-測繪國家自主減量貢獻與國際永續發展目標:減量行動與公共認知( II );Mapping Domestic Ndcs to Global Sustainable Development Goals: Climate Actions and Stakeholder Perceptions( II ) 李河清; 于蕙清
    2020-01-13 結合EVM/ESM/EDM方法之時程遲延分析技術之研究;Developing Schedule Delay Analysis Methods Based on Evm/Esm/Edm Approaches 楊智斌
    2020-01-13 運用大數據關聯法則、群啟發演算法以及深度學習演算法建置雲端智慧物聯 網營建產業鏈互動平台之研究;Establishing Smart Cloud-Iot Interaction Platform for Construction Value Chain Using Sip, Association Rules, and Deep-Learning Computational Approach 陳介豪
    2019-08-24 公共工程解約原因與特性分析之研究;Causes and Characteristic analysis of Contract Termination 陳盈瑄; Chen, Ying-Hsuan
    2019-08-19 運用PSO-SIP演算法辨識工程公司財務比率與表現之間的相關性;Exploring financial ratios combining PSO(SIP)-based Intelligence systems and statistical techniques(PSOISST) to identify variables affecting a construction company’s performance. 貝畢凡; Badjie, Bevan Annuerine
    2019-08-15 以競爭性對話改善政府採購之分析;Improving Government Procurement Procedures by Competitive Dialogue 丁怡禎; Ting, I-Jen
    2019-07-25 國內營建工程重工原因與特性之探討;Discussion on the Rework Cause and Characteristics of Domestic Construction Engineering Projects 吳臻玲; Wu, Jhen-Ling
    2019-07-25 推動零耗能建築窒礙問題與推行策略之探討 蕭文謙; Hsiao, Wen-Chien
    2019-07-24 系統化浮時計算及時程遲延分析程序之研究;System Development for Float Calculation and Schedule Delay Analysis 柯棨云; Ke, Chi-Yun
    2019-07-23 大型公共工程招標文件納入時程網圖之研究;A Study on Including Network Schedules into Tender Documents for Large Public Construction Projects 翟沛珺; Jai, Pei-Chun
    2019-07-17 以風險分配觀點解決工程履約爭議之研究 徐克銘; Hsu, Ko-Ming
    2019-07-16 越南營建產業中運用建築資訊建模之效益與障礙;Benefits and Barriers for Implementing BIM in Vietnam Construction Industry 潘氏青美; My, Phan Thi Thanh
    2019-07-11 工程驗收階段因瑕疵爭議衍生移交障礙之類型分析-以民間工程為核心 曾祥銘; Tseng, Shiang-Ming
    2019-07-10 台北捷運聯合開發權益分配鑑價機制之研究;A Study on the Appraisal Mechanism for Equity Distribution in the Joint Development Projects of Taipei Metro System 陳禾澤; Chen, He-Tse
    2019-07-02 PPP專案移轉階段技術性能風險控管之研究—以大陸高速公路為例;Research on Technical Performance Risk Control in the PPP Project Transfer Phase—Taking the Mainland Expressway as an Example 張弛承; CHICHENG, ZHANG
    2019-07-01 建築工程專案中建築資訊建模品質問題識別與改善方式之研究;Problem Identification and Quality Improvement of BIM models for Building Construction Projects 陳達恒; Heng, Chen-Da
    2019-06-27 公共工程的預防式工程界面管理之研究以捷運計畫施工界面的建構為例;Preventive Interface Management for Complex Capital Projects A Case Study of Mass Rapid Transit Project Construction 葉輝煌; Yeh, Huei-Huang
    2019-06-27 專案管理與統包BIM工作交付項目與審查方式之研究;A Study of BIM Deliverables and Review Methods for Professional Construction Management and Design/Build Contracts 吳怡娟; Wu, Yi-Juan
    2019-06-27 營建專案應用既有實獲值方法選用之研究;Selection of EVM, ESM, and EDM for Construction Projects 賴姿樺; Lai, Tzu-Hua

    Showing items 76-100 of 542. (22 Page(s) Totally)
    << < 1 2 3 4 5 6 7 8 9 10 > >>
    View [10|25|50] records per page

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明