English  |  正體中文  |  简体中文  |  Items with full text/Total items : 65318/65318 (100%)
Visitors : 22008962      Online Users : 491
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version
    考古題 [66/66]

    Collection Statistics

    近3年內發表的文件: 48(11.06%)
    含全文筆數: 434(100.00%)

    文件下載次數統計
    下載大於0次: 434(100.00%)
    下載大於100次: 418(96.31%)
    檔案下載總次數: 344855(95.73%)

    最後更新時間: 2019-07-19 20:25


    上傳排行

    資料載入中.....

    下載排行

    資料載入中.....

    RSS Feed RSS Feed
    跳至:
    或輸入年份:
    由新到舊排序 由最舊的開始

    顯示項目251-275 / 434. (共18頁)
    << < 6 7 8 9 10 11 12 13 14 15 > >>
    每頁顯示[10|25|50]項目

    日期題名作者
    2009-05-30 以專案管理計分卡運用在建築專案執行之研究; A research on the utilization of project management scorecard in the implementation of a construction project 張岸礕; An-pi Chang
    2009-05-20 統包模式規劃設計階段影響進度之研究-以變電所工程為例; Factors Affecting Design Schedule in Turnkey Project- An Example of Primary Distribution Substation Project 吳淑惠; Shu-Hui Wu
    2009-05-15 建立營造業勞工安全管理機制-降低職業災害之研究; A Research on the Management Mechanism of Construction Safety and Health to Prevent Occupational Hazards 曲晉興; CHIN-HSING CHU
    2009-01-12 工程變更設計對工程總管理費影響之研究-以建築工程為例; Quantifying the impact of change to construction project overhead 康錫川; KANG HIS CHUAN
    2009-01-12 道路零星修補及挖掘路面修復精進策略之研究; Pavement fragment repairand Pavement excavation repair Plant Operation Strategy 徐志鵬; Chih-peng Hsu
    2008-11-28 平衡計分卡制度導入建設公司經營管理模式之研究; The balanced scorecard system to induct the construction company management of research 紀明潭; Ming-tan Chi
    2008-10-09 建築基礎工程採用壁樁及其他工法成效之分析研究; Construction build to use wall-ytpe foundation and other manner results to analyze research 黃文隆; wen-lung Huang
    2008-10-09 公務機關善用資源以提升工務管理服務品質-以桃園縣政府工務處為例; Public agency makes good use of the resources take to promote the engineering supervisory service quality - by the Taoyuan County government public works department as an example 廖雅玲; Ya-ling Liao
    2008-07-12 都市焚化廠設施維護管理之研究--以台北縣八里焚化廠為例 彭競輝; Ching-Hui Peng
    2008-07-12 民間建築產業施工品質驗證制度之研究-以「建築物生產履歷」為例 鄭正義; Cheng-yi Cheng
    2008-07-12 臺北市頂樓違章建築處理探討及改善對策之研究-以市民觀點論述; The performance and research of improving the countermeasure in the Roof Annex of TAIPEI City - Describe citizen's view 黃建中; Chien-chung Huang
    2008-07-11 營建工地土石方調派最佳化模式之研究; An Optimization Model for Earthwork Allocation in a Construction Site 陳俊成; Chun-Chen Chen
    2008-07-11 機關衛生稽查人力指派最佳化模式之研究; AN OPTIMIZATION MODEL FOR MANPOWER ASSIGNMENT TO OFFICIAL AUDITING IN SANITARY AFFAIRS 葉慶仲; Ching-Chung Yeh
    2008-07-11 公園維護人力指派最佳化模式之研究; An Optimization Model For Park Maintenance Manpower Assignment 徐裕淳; Yu-chun Hsu
    2008-07-11 營建工程短期人力指派最佳化模式之研究; Optimization of Short-Term Labor Force Assignments in Construction 俞偉武; Wei-wu Yu
    2008-07-02 臺北市現行災防體系之研究-以地震災害為例; The research of the disaster prevention and protection system of Taipei City-Take Earthquake Disaster as an example. 魏智群; CHIH-CHUN WEI
    2008-06-28 瀝青混凝土生產之品質管理-以雪山隧道為例; Quality Management of Asphalt Concrete Production: a case study of Hsuehshan Tunnel paving construction 郎世寧; Shih-ning Lang
    2008-06-28 人性化透水性鋪面成效評估之研究?以縣道及鄉道人行道為例?; To study the effect of people friendly and water penetration on pavement - which use county roads, township roads and pedestrian walks as examples. 彭純美; CHUN-MEI PENG
    2008-06-27 公共工程統包商之經營管理研究─以大型工程顧問公司為例 陳體宏; Tee-Horng Chen
    2008-06-27 解決捷運工程施工界面問題之探討-以臺北捷運(CD550標)工程為例; The study of how to solving the construction interface problems on Mass Rapid Transportation engineering-Taipei Metro (CD550) project as example. 邱金鶴; CHIN-HO CHIU
    2008-06-23 建築工程隱藏性成本之探討-以逆打施工之建築工程為例; Investigation of Hidden Costs for Building Construction – A Case Study of Top-down Construction Building Projects 沈士傑; Shih-chien Shen
    2008-06-21 臺北市營建剩餘資源流向追蹤及自律管理之研究; The study of flow circumstance tracing management for construction surplus sand and gravel in Taipei city 張廖年鴻; NINE-HONG CHANG LIAO
    2008-06-20 汛期颱風防汛人員指派研究; On the study of manpower assignment for flood prevention in Typhoon season. 陳貴青; Kuei-ching Chen
    2008-06-20 災後搶修設計工作人力指派最佳化之研究; Optimal Assignment of Post-Disaster Repair Work Designers 張克誠; Keh-chen Chang
    2008-06-20 陸面機械清淤作業機具指派最佳化之研究; Opitimal assignment of dredging mechanines for mechanical excavation 范元淵; Yuan-Yuan Fan

    顯示項目251-275 / 434. (共18頁)
    << < 6 7 8 9 10 11 12 13 14 15 > >>
    每頁顯示[10|25|50]項目

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 回饋  - 隱私權政策聲明