中大機構典藏-NCU Institutional Repository-提供博碩士論文、考古題、期刊論文、研究計畫等下載:
English  |  正體中文  |  简体中文  |  Items with full text/Total items : 78818/78818 (100%)
Visitors : 34836327      Online Users : 1232
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version
    Electronic Thesis & Dissertation [340/340]
    journal & Dissertation [23/23]
    retired tests [42/42]

    Collection Statistics

    Item counts issued in 3 years: 0(0.00%)
    Items With Fulltext: 127(100.00%)

    Download counts of the item
    Download times greater than 0: 127(100.00%)
    Download times greater than 100: 127(100.00%)
    Total Bitstream Download Counts: 59181(17.30%)

    Last Update: 2024-05-01 01:52


    Top Upload

    Loading...

    Top Download

    Loading...

    RSS Feed RSS Feed
    Jump to a point in the index:
    Or type in a year:
    Ordering With Most Recent First Show Oldest First

    Showing items 51-100 of 127. (3 Page(s) Totally)
    << < 1 2 3 > >>
    View [10|25|50] records per page

    DateTitleAuthors
    2012-12-01 氣候變遷環境下永續性工程之因應研究-以道路運輸工程為例-氣候變遷環境下永續性工程成本效益之因應研究-以道路運輸工程為例(III);Strategies for Using Cost Efficiency Analysis in Sustainable Construction in Response to the Global 陳介豪; 張又升
    2012-12-01 氣候變遷環境下永續性工程之因應研究-以道路運輸工程為例-氣候變遷環境下永續性工程資源循環利用之因應研究-以道路運輸工程為例(III);Strategies for Using [[Recycle Materials]] in Sustainable Construction in Response to the Global Climate Change Issues – Example of Roadway Construction 黃榮堯
    2012-12-01 智慧型計算應用於不動產估價模式自動化之研究;Automating Appraisal Model for Real Estate Using Computational Intelligence 陳介豪
    2012-12-01 極端氣候下複合性災害防治之研究-極端氣候下因應複合性災害橋梁工程調適策略之研究( III );Adaptation Strategies of Bridge Engineering in Response to Compound Disasters Caused by Extreme Weather Conditions 姚乃嘉; 陳介豪; 蔡龍治; 黃榮堯; 許文科; 蘇木春
    2012-12-01 預防性維護導向橋梁劣化關聯規則之研究;Preventive Maintenance Approach -A Study of Association Rules for Bridge Deterioration 黃榮堯
    2012-12-01 應用本體論於營造安全規範半自動辨識之研究;Application of Ontology to Semi-Automated Identification of Construction Safety Specification 王翰翔
    2012-09-01 氣候變遷環境下永續性工程之因應研究-以道路運輸工程為例-氣候變遷環境下永續性工程安全防災之因應研究-以道路運輸工程為例(III);Strategies for Disaster Prevention in Sustainable Construction in Response to the Global Climate Change Issues – Example of Roadway Construction 姚乃嘉
    2012-09-01 極端氣候下複合性災害防治之研究-極端氣候下因應複合性災害橋梁工程調適策略之研究( III );Adaptation Strategies of Bridge Engineering in Response to Compound Disasters Caused by Extreme Weather Conditions 姚乃嘉; 許文科; 蘇木春; 陳介豪; 蔡龍治; 黃榮堯
    2012-09-01 智慧型計算應用於不動產估價模式自動化之研究;Automating Appraisal Model for Real Estate Using Computational Intelligence 陳介豪
    2012-09-01 氣候變遷環境下永續性工程之因應研究-以道路運輸工程為例-氣候變遷環境下永續性工程成本效益之因應研究-以道路運輸工程為例(III);Strategies for Using Cost Efficiency Analysis in Sustainable Construction in Response to the Global 陳介豪; 張又升
    2012-09-01 交通運輸工程節能減碳規劃設計手冊研究與編訂 黃榮堯
    2012-09-01 氣候變遷環境下永續性工程之因應研究-以道路運輸工程為例-氣候變遷環境下永續性工程資源循環利用之因應研究-以道路運輸工程為例(III);Strategies for Using [[Recycle Materials]] in Sustainable Construction in Response to the Global Climate Change Issues – Example of Roadway Construction 黃榮堯
    2012-09-01 預防性維護導向橋梁劣化關聯規則之研究;Preventive Maintenance Approach -A Study of Association Rules for Bridge Deterioration 黃榮堯
    2012-09-01 考量浮時消耗之時程延遲分析方法之建立;Developing a Schedule Delay Analysis Method with Considering Float Consuming 楊智斌
    2012-02-01 交通運輸工程節能減碳規劃設計手冊研究與編訂 黃榮堯
    2011-11-01 環境科學傳播;Environmental Science Communication 呂理德
    2011-08-01 我國BIM架構政府採購制度之研究;Research on Bim-Based Government Procurement System in Taiwan 謝定亞
    2011-08-01 氣候變遷環境下永續性工程之因應研究-以道路運輸工程為例-氣候變遷環境下永續性工程之因應研究-以道路運輸工程為例-氣候變遷環境下永續性工程安全防災之因應研究-以道路運輸工程為例(II);Strategies for Disaster Prevention in Sustainable Construction in Response to the Global Climate Change Issues – Example of Roadway Construction 姚乃嘉
    2011-08-01 氣候變遷環境下永續性工程之因應研究-以道路運輸工程為例-氣候變遷環境下永續性工程資源循環利用之因應研究-以道路運輸工程為例(II);Strategies for Using Recycle Materials in Sustainable Construction in Response to the Global Climate Change Issues – Example of Roadway Construction 黃榮堯
    2011-08-01 氣候變遷環境下永續性工程之因應研究-以道路運輸工程為例-氣候變遷環境下永續性工程成本效益之因應研究-以道路運輸工程為例(II);Strategies for Using Cost Efficiency Analysis in Sustainable Construction in Response to the Global 陳介豪; 張又升
    2011-08-01 極端氣候下複合性災害防治之研究-極端氣候下因應複合性災害橋梁工程調適策略之研究( II );Adaptation Strategies of Bridge Engineering in Response to Compound Disasters Caused by Extreme Weather Conditions 姚乃嘉; 蔡龍治; 蘇木春; 黃榮堯; 許文科; 陳介豪
    2011-08-01 考量工率折減之時程延遲分析方法之建立(III);Developing a Schedule Delay Analysis Method Considering Lost Productivity (Iii) 楊智斌
    2010-08-01 永續營建評估指標系統建立之研究; Development of an Appraisal Indexing System for Sustainable Construction 黃榮堯
    2010-08-01 氣候變遷環境下永續性工程成本效益之因應研究---以道路運輸工程為例(I); Strategies for Using Cost Efficiency Analysis in Sustainable Construction in Response to the Global Climate Change Issues---Example of Roadway Construction (I) 陳介豪; 張又升
    2010-08-01 氣候變遷環境下永續性工程之因應研究---以道路運輸工程為例(I); Strategies for Disaster Prevention in Sustainable Construction in Response to the Global Climate Change Issues---Example of Roadway Construction (I) 姚乃嘉
    2010-08-01 我國營建業BIM發展策略之研究---總計畫暨子計畫一:運用建築資訊建模技術自動建立專案分工(WBS)之研究; Using BIM Technique to Automatically Produce Project WBS of Buildings 謝定亞; 陳怡兆; 謝尚賢; 馮重偉; 陳鴻銘; 范素玲; 周建成
    2010-08-01 極端氣候下複合性災害防治之研究---極端氣候下因應複合性災害橋梁工程調適策略之研究(I); Adaptation Strategies of Bridge Engineering in Response to Compound Disasters Caused by Extreme Weather Conditions (I) 姚乃嘉; 許文科; 蘇木春; 陳介豪; 蔡龍治; 黃榮堯
    2010-08-01 氣候變遷環境下永續性工程之因應研究---以道路運輸工程為例(I) 黃榮堯
    2010-05-01 「臺灣地區橋梁管理資訊系統」橋梁資料查核計畫; Validation of Bridge Inventory Data in the Taiwan Bridge Management System 姚乃嘉; 陳建州; 周慧瑜; 陳明正; 鄭家齊
    2010-04-01 橋梁目視檢測評估手冊(草案)之研擬; Establishment of Bridge Visual Inspection and Evaluation Manual (Draft) 姚乃嘉; 葉啟章; 陳明正
    2009-09-01 國營事業是否適用政府採購相關法規之研究;Study on Fitness of Governemtal Procurement Regulations into State Owned Enterprises 謝定亞; 黃立; 顏玉明; 張南薰
    2009-09-01 橋梁定期檢測路徑規畫之研究;A Study on Route Planning for Regular Bridge Inspection 姚乃嘉
    2009-09-01 SOMOC群集演算法應用於建物修繕預測之研究;Prediction Building Renovation Using SOMOC Clustering Algorithm 陳介豪
    2009-09-01 政府採購法施行以來後續擴充制度實施現況分析與改善研究;Analysis of Continuing Expansion System Implementation Status Quo and Improvement since Government Procurement Law Promulgated 謝定亞
    2008-10-01 無線感測器網路於自來水輸送管線監控之應用與研究; Application of Wireless Sensor Network in Water Pipeline Monitoring System 黃榮堯
    2008-09-01 臺灣地區橋梁DER&U目視檢測評估法之改善研究 姚乃嘉
    2008-09-01 公路養護共通性業務支援系統開發;Development of a Management Support System for Common Administrative Affairs of Highway Maintenance 姚乃嘉; 嚴崇一
    2008-09-01 運用SOMO與PSO於營建工程全套管切削樁壁施工排序之研究;Optimization of Construction Sequencing for Secant Pile Wall Using SOMO & PSO Algorithms 陳介豪
    2008-09-01 橋梁LCCA導入可靠度理論之構件劣化預測模式之研究(III);A Reliability-Based Component Deterioration Model for Bridge LCCA(III) 黃榮堯
    2008-09-01 建立永續公共工程指標系統之研究;Development of An Assessment System for Sustainable Infrastructures 黃榮堯; 周南山; 廖肇昌; 蔡厚男; 林文雄
    2008-09-01 工程爭議導向之專案文件管理系統之發展---Client-Server架構建置與實務驗證;Implementation of Construction Dispute Oriented Project Document Control System under Client-Server Framework 謝定亞
    2008-07-01 政府採購投標廠商資格設定之研究; A Study on the Qualifications of Tenderers in Government Procurement Act 李建中
    2008-07-01 橋梁LCCA導入可靠度理論之構件劣化預測模式之研究(II); A Reliability-Based Component Deterioration Model for Bridge LCCA (II) 黃榮堯
    2008-07-01 工程爭議導向之專案文件管理雛型系統; A Prototype for Construction Dispute Oriented Project Document Management System 謝定亞
    2008-07-01 運用衍生性金融商品於營造廠從事公共工程融資與風險規避之研究; Derivative Security Financing and Hedging Approach to Infrastructural Projects for Construction Companies 陳介豪
    2008-07-01 橋梁維護管理決策支援系統之建立; Development of Bridge Maintenance Decision Support System 姚乃嘉
    2007-12-01 公路景觀資訊平台建置及規劃作業推廣計畫 姚乃嘉
    2007-07-01 我國統包制度對於營造產業發展影響之研究; The Influence of the Design-Build Method on the Development of Construction Industry in Taiwan 李建中
    2007-07-01 客帳代理經營應用於營建業營運資金管理之研究; Factoring Applied to Working Capital Management for Construction Companies 陳介豪
    2007-07-01 橋梁LCCA導入可靠度理論之構件劣化預測模式之研究(I); A Reliability-Based Component Deterioration Model for Bridge LCCA (I) 黃榮堯

    Showing items 51-100 of 127. (3 Page(s) Totally)
    << < 1 2 3 > >>
    View [10|25|50] records per page

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明