English  |  正體中文  |  简体中文  |  Items with full text/Total items : 83776/83776 (100%)
Visitors : 59792452      Online Users : 1016
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version
    Research Project [127/127]
    journal & Dissertation [23/23]
    retired tests [42/42]

    Collection Statistics

    Item counts issued in 3 years: 43(11.88%)
    Items With Fulltext: 362(100.00%)

    Download counts of the item
    Download times greater than 0: 362(100.00%)
    Download times greater than 100: 353(97.51%)
    Total Bitstream Download Counts: 258864(68.43%)

    Last Update: 2025-11-26 02:42


    Top Upload

    Loading...

    Top Download

    Loading...

    RSS Feed RSS Feed
    Jump to a point in the index:
    Or type in a year:
    Ordering With Most Recent First Show Oldest First

    Showing items 176-200 of 362. (15 Page(s) Totally)
    << < 3 4 5 6 7 8 9 10 11 12 > >>
    View [10|25|50] records per page

    DateTitleAuthors
    2015-08-28 公共工程聯合承攬協議書運作制度與探討 楊仲福; Yang,Chung-fu
    2015-08-28 運用電腦模擬輔助施工碳盤查作業之研究-以混凝土坡面工為例;Application of Computer Process Simulation to Assist in the Carbon Inventory of Construction Operations – Using the Concrete Construction of a River Bank Project as An Example 洪子賀; Hung,Tzu-ho
    2015-08-27 危險性工作場所審查機制之研究 趙文成; Chao,Wen-Cheng
    2015-08-24 工程餘土平衡與交換之減碳效益評估模式建立之研究;Developing Models for Evaluating the Carbon Reduction by the Balance and by the Exchange of Construction Surplus Soils 蔡委諺; Tsai,Wei-yen
    2015-08-24 結合竣工時程網圖與BIM技術以利爭議釐清之研究;Integrating As-built Schedule and BIM Technology for Clarifying Construction Disputes 楊雨蒨; Yang,Yu-Chien
    2015-08-24 綠建材標章市場效益與推動策略之研究;A Study on the Market Benefits of Getting Green Building Material Labels and its Promotion Strategies 劉德人; Te-jen,Liu
    2015-08-20 營建工程時程網圖審查準則之研究;Establishment of Schedule Review Criteria for Construction Project 林君頤; Lin,Chun-yi
    2015-08-06 The Effect of Applying Solar Photovoltaic for Building Energy Conservation: A Case Study in Taiwan;The Effect of Applying Solar Photovoltaic for Building Energy Conservation: A Case Study in Taiwan 阮達和; Nhut,Nguyen Dac
    2015-08-04 以貝式信念網路為基礎之工作危害分析與風險評估方法;Bayesian Belief Network Approach for Analysing Job Hazard and Assessing Risk 黛安娜; HAYATI,DIANA WAHYU
    2015-07-29 飛機發動機維修履約管理問題之研究 黃俊榮; Huang,Jiun-rung
    2015-07-29 營造物料損耗管理策略之研究-由分包契約激勵機制為中心 簡詩鴻; Chien,Shih-hung
    2015-07-28 公共工程減價收受之訴訟爭議案例分析;A Study on Litigation Cases of Acceptance with Price-Reduction in Public Construction Projects 葉奕穎; Yeh,Yi-Ying
    2015-07-28 自動化無人飛行載具輔助擷取橋梁影像之研究;Capturing Images for Bridge Inspection using Automated Unmanned Aerial Vehicle 施旻汶; Wen,Shih-Min
    2015-07-27 印尼營建專案中不可原諒延遲原因與其發生機率之分析;The Non-Excusable Delay Causes and Occurrence Probability For The Construction Projects in Indonesia 尹惠蘭; Islami,Rizky Citra
    2015-07-24 整合時間與成本觀點以改善總浮時管理技術於延遲索賠準備之應用;Improving Total Float Management for Delay Claims Preparation Integrating Time and Cost Perspectives 何柏閔; Vo,Minh Huy
    2015-07-17 運用符號取代施工指令以提升工率之研究-以建築模板板施工為例 黃國豪; HUANG,KUO-HAO
    2015-07-14 以可靠度劣化預測模式評估橋梁構件生命週期維護成本之研究;Lifecycle Assessment of Maintenance, Repair and Rehabilitation Costs: A Reliability Based Deterioration Modeling Approach for Bridge Components 毛一祥; Mao,I-shiang
    2015-01-23 以區域經濟與環境特徵建構不動產估價趨勢函數 趙健宏; Chao,Chien-Hung
    2014-10-22 以BIM模型為基礎之專案排程項次分析;Analyzing scheduling activities based on BIM models 李鎧帆; Li,Kai-Fan
    2014-08-26 應用建築資訊模型輔助橋梁目視檢測之研究;Application of building information model (BIM) for assisting bridge inspection 周昱棋; Chou,Yu-chi
    2014-08-25 應用知識本體技術協助建築專案單價分析作業之研究;Unit price analysis for construction projects using ontology 羅明杰; Luo,Ming-Jie
    2014-08-22 民間參與公共建設爭議處理協調委員會機制之研究與建議 周逸濱; CHOU,YI-PIN
    2014-07-29 Exploring and weighting features for Financially Distressed Construction Companies using Swarm Inspired Projection (SIP) Algorithm 貝畢凡; Badjie,Bevan Annuerine
    2014-07-29 營建專案人力配置最佳化及參與時序模式建立;THE IMPACT FACTORS AND PREDICTING ALLOCATION OF ON-SITE AND OFF-SITE MANPOWER FOR CONSTRUCTION PROJECTS 陳韋向; Chen,Wei-Hsiang
    2014-07-25 建築物雙層牆節能效果評估之研究;PERFORMANCE EVALUATION OF DOUBLE WALL IN REDUCING BUILDING ENERGY CONSUMPTION 希蘇葳; Widaya,Ristu

    Showing items 176-200 of 362. (15 Page(s) Totally)
    << < 3 4 5 6 7 8 9 10 11 12 > >>
    View [10|25|50] records per page

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明