English  |  正體中文  |  简体中文  |  Items with full text/Total items : 83696/83696 (100%)
Visitors : 56306988      Online Users : 1118
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version

    Community Statistics


    Item counts issued in 3 years: 43(7.76%)
    Items With Fulltext: 554(100.00%)

    Download counts of the item
    Download times greater than 0: 554(100.00%)
    Download times greater than 100: 543(98.01%)
    Total Bitstream Download Counts: 372489(0.80%)

    Last Update: 2025-10-22 07:25

    Top Upload

    Loading...

    Top Download

    Loading...

    RSS Feed RSS Feed
    Jump to a point in the index:
    Or type in a year:
    Ordering With Most Recent First Show Oldest First

    Showing items 176-200 of 554. (23 Page(s) Totally)
    << < 3 4 5 6 7 8 9 10 11 12 > >>
    View [10|25|50] records per page

    DateTitleAuthors
    2017-01-20 運用關聯法則探討預鑄構件生產派工之研究;Exploring association rules of work activities for producing precast components in Taiwan construction industry. 吳宗瑋; Wu, Zong-Wei
    2017-01-19 建築預鑄結構體生產難易度分級與分析之研究;Integrating precast big data and computational intelligence to classify the levels of construction difficulty 戴興偉; Tai, Hsing-Wei
    2016-12-31 整合巨量資料與計算型智慧技術探討預鑄構件施作難易程度分級、勞工成本管控以及人力派遣最佳化之研究;Integrating Precast Big Data and Computational Intelligence to Classify Construction Difficulty, Manage Direct Labor Costs, and Optimize Manpower Allocation 陳介豪
    2016-12-31 機關辦理公共工程導入建築資訊建模(BIM)技術 楊智斌
    2016-08-31 UAV結合VR技術之先期研究暨水下橋檢工具初探;A Pilot Study on Integrating UAV and VR technologies and a Primitive Investigation of Underwater Bridge Inspection Tools 姚乃嘉; 陳柏翰; 廖先格
    2016-08-31 以海量資料分析技術探討橋梁管理資料庫以擬定維護管理策略之研究;Analyzing Taiwan Bridge Management System Using Big Data Approach for Determining Maintenance Strategies 姚乃嘉
    2016-08-31 我國橋梁檢測方式之發展探究;Exploring the development of bridge inspection methodologies in Taiwan 姚乃嘉; 王仲宇; 陳明正; 廖先格
    2016-08-31 結合BIM技術之時程延遲分析技術研發;Development of a Schedule Delay Analysis Approach Integrated with Bim Technique 楊智斌
    2016-08-31 應用知識本體建模技術輔助特性要因分析之研究;Applying Ontological Modeling Technique to Support Cause and Effect Analysis 王翰翔
    2016-08-26 專案層級河川工程永續營建評估指標系統建立之研究;Development of a sustainability appraisal system for project-level river facilities constructions 蔡宗益; Tsai,Tsung-Yi
    2016-08-25 應用FMEA與模糊德菲法於箱梁假組立風險評估之研究 王朝輝; Wang,Chao-Hui
    2016-08-24 國內節能路燈採購模式及案例分析;Procurement Model and Case Study on Energy-saving Street Light Replacement Projects in Taiwan 朱如鵬; Chu,Ru-Peng
    2016-08-17 成效式契約應用於專案管理技術服務之研究;A study of applying performance-based contracts to professional constrction management service 謝東陞; Hsieh,Tung-Sheng
    2016-08-17 綠牆系統溫度及熱傳遞影響因素分析之研究-以台灣建築為例;Analysis of Factors Related to Green Wall Temperature Performance and Heat Transfer: Case Study of Buildings in Taiwan 雷諾; Yunantara,Rino
    2016-07-27 以民間實施者角度探討都市更新 衝突因子與因應對策之研究;Identifying impact factors and strategies for urban renewal: A viewpoint from private sectors 葉朝麒; chi,Yeh Chao
    2016-07-27 都會地區快速道路特性對物流車輛速度與碳排放影響之研究-以東京都會地區為例;Impact of Urban Road Characteristics to Freight Vehicle CO2 Emission and Velocity: Tokyo Metropolitan Area 魏薪怡; Wei,Hsin-Yi
    2016-07-27 營建工地人為錯誤分析之認知因子辨識與涵義;Identification and implication of cognitive factors for on site human error analysis 米琳; Milhim,Emmanuel Christine
    2016-07-26 以工項組合進行工程碳推估之研究-以河川堤岸工程為例;Carbon Emission Estimation Using Construction Activity Portfolio for River Embankment Construction Projects 范智豪; Fan,Chih-Hao
    2016-07-25 以安全氣候評估國內營造業分包制度與勞工安全之研究-以台灣北部營造業為例 黃韋嘉; Huang,Wei-Chia
    2016-07-25 營造業標竿學習對象決定模式之研究 蘇能歆; Su,Neng-Hsin
    2016-07-21 以無人飛行載具拍攝影像建置三維橋梁模型之初步研究;A Preliminary Study on Generation of 3D Bridge Models using Images Captured by Unmanned Aerial Vehicle 吳明諺; Wu,Ming-Yen
    2016-07-21 桁架橋目視檢測評估方法與長桿檢測工具之研究;Visual Inspection and Evaluation Methodology for Truss Bridges and Development of a Long Rod Inspection Tool 白耀升; Pai,Yao-Sheng
    2016-07-20 營建工程時程網圖審查作業流程與準則建立之研究;Establishment of Schedule Review Process and Criteria for Construction Projects 周詠傑; Chou,Yung- Chieh
    2016-07-18 永續道路工程影響因子與人力推估模式之建立 林尚儀; Lin,Shang-I
    2016-07-15 以取得使用執照為導向時程規劃策略之研究-以高科技廠房專案為例 陳靖弘; Chen,Ching-Hung

    Showing items 176-200 of 554. (23 Page(s) Totally)
    << < 3 4 5 6 7 8 9 10 11 12 > >>
    View [10|25|50] records per page

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明