English |
正體中文
|
简体中文
|
Items with full text/Total items : 80990/80990 (100%)
Visitors : 41677502 Online Users : 1500
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by
NTU Library IR team.
Scope
All of NCUIR
Engineering College
Executive Master of Construction Engineering and Management
--Electronic Thesis & Dissertation
Tips:
please add "double quotation mark" for query phrases to get precise results
please goto advance search for comprehansive author search
Adv. Search
Home
‧
Login
‧
Upload
‧
Help
‧
About
‧
Administer
NCUIR
>
Engineering College
>
Executive Master of Construction Engineering and Management
>
Electronic Thesis & Dissertation
>
Browse By Title
Browse By Date
Browse By Authors
Loading...
Siblings
retired tests
[
6
/6]
Collection Statistics
Item counts issued in 3 years: 45(26.79%)
Items With Fulltext: 168(100.00%)
Download counts of the item
Download times greater than 0: 168(100.00%)
Download times greater than 100: 123(73.21%)
Total Bitstream Download Counts: 92780(95.99%)
Last Update: 2024-11-22 00:02
Top Upload
Loading...
Top Download
Loading...
Recent Submissions
出流管制計畫管控精進作法之研究-以桃園市為例;A Study on I...
機電空調承商工程承攬獲利能力之研究
行政法人工程採購制度優化之分析;mprovement of Const...
應用層級分析法(AHP)建立影響鋼構橋梁腐蝕性因子排序之研究
設計階段模型沿用至施工階段之檢核機制與流程建構
我國室內裝修爭議問題與解決方案之探討;Exploration of I...
大型建築工程影響聯合承攬團隊整合因子之研究;Study On Fact...
鋼構廠放樣人員人力指派最佳化之研究;Optimization of M...
鐵路機構可歸責於司機員之行車事故事件原因分析 (以臺鐵公司為例);An...
營造業施工機具租賃平臺之初步研究:以高空作業車為例;Prelimina...
Jump to a point in the index:
(Choose year)
2024
2023
2022
2021
2020
2019
2018
2017
2016
2015
2014
2013
2012
2011
2010
2009
2008
2007
2006
2005
2004
2003
2002
2001
2000
1999
1998
1997
1996
1995
1994
1993
1992
1991
1990
1985
1980
1975
1970
1960
1950
(Choose month)
January
February
March
April
May
June
July
August
September
October
November
December
Or type in a year:
Ordering With Most Recent First
Show Oldest First
Showing items 51-75 of 168. (7 Page(s) Totally)
<<
<
1
2
3
4
5
6
7
>
>>
View [
10
|
25
|
50
] records per page
Date
Title
Authors
2021-01-25
桃園市房屋建築工程作業基金設立之研究
張厚凱
;
Kai, Chang Hou
2020-07-30
應用成效式契約改善公有住宅維護管理績效之研究;A study of applying performance-based contract to improve management performances in public housing maintenance
潘重璋
;
Pan, Chong-zhang
2020-07-29
營造業工程人員之正念覺察特質與 安全行為關聯性之探討;A Study on the Correlation between the Mindful Awareness Features and Safety Behavior of Construction Personnel
黃子豪
;
Huang, Tzu-Hao
2020-07-28
H型鋼構件智慧塗裝路徑優化研究;The research of H-shaped steel intelligent coating
戴萬源
;
Tai, Wan-Yuan
2020-07-28
中小型顧問公司因應現況環境之發展策略探討
呂玉玫
;
Lu, Yu-Mei
2020-07-28
火力發電廠工程進度落後原因 與因應作為之研究;A Study on Identifying Causes of Schedule Delay for Thermal Power Plant Projects and Related Prevention Works
白智仁
;
Pai, Chih-Jen
2020-07-28
桃園市共同管道建設與管理策略之研究
吳峰凱
;
Wu, Feng-Kai
2020-07-28
逆打與雙順打工法應用於SRC結構之工期探討;A Study on Construction Durations of SRC Structures Using Top-down and Up-upConstruction Methods
李培華
;
HUA, LEE PEI
2020-07-28
高科技廠房設備維護契約特性分析與選擇程序建立之研究;Characteristics Analysis and Model Selection of High-tech Factory Equipment Maintenance Contracts
王舜民
;
WANG, SHUN-MIN
2020-07-24
公共工程以循環經濟模式執行之探討;Research on public works implemented in a circular economy
游適駿
;
Yu, shi-jun
2020-07-23
專案管理在履約爭議處理機制之比較與研析
門毅
;
Men, Yi
2020-07-20
學習場域災防室內疏散速率之研究;A study toward disaster prevention evacuation for indoor learning fields
賴竑融
;
Lai, Hung-Jung
2020-07-09
橋梁檢測人力機具排班最佳化之研究
陳延齡
;
LING, CHEN YEN
2020-01-17
預售屋合宜交屋作業時序研討;A study toward adequate timing for presale housing transfer
梁海天
;
Liang, Hai-Tien
2020-01-15
軌道扣件系統破損原因與解決措施之探討-以桃園機場捷運為例;Study of The Trackwork Fastener System Damage Reasons and Solutions for Taiwan Tauyuan International Airport Access MRT
李明宗
;
Lee, Ming-Tsung
2020-01-14
以消費者接受度分析智慧建築標章發展之認知差異初探;Preliminary exploration towards perceptual difference for intelligent building label based on customer viewpoint
韓家駿
;
Han, Chia-Chun
2020-01-10
公共工程因業主採行BIM所衍生契約問題及改善建議之探討;Study on Contractual Issues and Solutions Derived from Implementing BIM by Owner of Public Works
李惠美
;
LEE, HUI-MEI
2020-01-10
桃園機場第二航廈營運中擴建施工管理對旅客服務品質影響之研究
李國強
;
Li, Guo-Qiang
2019-08-26
國內工程工期爭議訴訟處理程序之研究;A Study on Resolution Processes of Construction
温藝玲
;
Wen, I-Ling
2019-08-24
景觀工程常見履約爭議;Common Performance Disputes in Landscape Projects
張瑋如
;
Chang, wei-ru
2019-08-22
我國網球場館經營策略之研究-以台北網球中心為例
胡旭煒
;
Hu, Hsu-Wei
2019-07-24
地質鑽探報告與地下管線推進工程風險分配之探討;Risk Allocation in Jacking Method for Underground Lines Based on Geotechnical Investigation Report
呂嘉坤
;
Lu, Jia-Kun
2019-07-11
巨額工程採購最有利標評選之研究:風險合理化之觀點
黃雄成
;
Huang, Hsiung-Cheng
2019-06-27
利用支持向量迴歸建構超高壓架空鐵塔基礎費用預測模型;Predicting Construction Cost For Extra-High Voltage Transmission Tower Foundations Using Support Vector Regression
陳俞均
;
Chen, Yu-Chun
2019-06-11
校園建築屋頂型太陽光電發電設備決策模式之探討-以中央大學為例;A Discussion of the Decision-Making Model of Rooftop Photovoltaic Generation Equipment on Campus Buildings - A Case Study of National Central University
李建宏
;
Lee, Chien-Hung
Showing items 51-75 of 168. (7 Page(s) Totally)
<<
<
1
2
3
4
5
6
7
>
>>
View [
10
|
25
|
50
] records per page
::: Copyright National Central University. | 國立中央大學圖書館版權所有 |
收藏本站
|
設為首頁
| 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
DSpace Software
Copyright © 2002-2004
MIT
&
Hewlett-Packard
/
Enhanced by
NTU Library IR team
Copyright ©
-
隱私權政策聲明